My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2003 - 2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4445
>
2300 - Underground Storage Tank Program
>
PR0231785
>
BILLING 2003 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 12:02:16 PM
Creation date
11/6/2018 10:18:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2003 - 2014
RECORD_ID
PR0231785
PE
2361
FACILITY_ID
FA0003994
FACILITY_NAME
PERSHING GAS FOR LESS
STREET_NUMBER
4445
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11018006
CURRENT_STATUS
01
SITE_LOCATION
4445 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PERSHING\4445\PR0231785\BILLING\BILLING 2003 - 2014 .PDF
QuestysFileName
BILLING 2003 - 2014
QuestysRecordDate
8/30/2016 9:49:09 PM
QuestysRecordID
3179084
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f� SAN 7AQ10wi COUNTY ENVIRONMENTAL HEALTHb2PARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- PAGE 1 <br /> TYPE OF ACTION ❑ 1 2.CHANGE OF INFORMATION "101 <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL LISTS AT THIS FACILITY. >102. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> LFACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> FACILITYNAME P6"We, 7 M03. <br /> FACILITY SITE ADDRESS ,q Z J 4 S p, rh Jill Rx M04. CITY Mos. <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENA CE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in Mos. <br /> accordancewith the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualifi d personnel. <br /> MONITORING EQUIPMENT IS SERVICED 5a_1.ANNUALLY 51-91 .. (Specify): °107 <br /> III. MONITORINGLOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i e,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagran3(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MON[WRING IS PERFORMED USING THE FOLLOWING METIIOD(S):(Check that M <br /> Im <br /> CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: a T b.LIQUID FILLED ❑ c.UNDER PRESSURE El d.UNDER VACUUM Mir. <br /> PANEL MANUFACTURER: Sire P I u"� -L D S "n" MODEL#: M13. <br /> LEAK SENSOR MANUFACTURER: 'CA 16dfml PDS M14. MODEL#(S): 4 3g�- 5OZ M15. <br /> AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TOM TUTOR SIT,tE'WRLCTI4SQI£fSlb .yryq{� <br /> PANEL MANUFACTURER: g M36. MODEL#: MIT <br /> IN-TANK PROBE MANUFACTURER: MIB. MODEL#(S): Mls. <br /> LEAK TEST FREQUENCY: ?.a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY Mm. <br /> ❑. d.MONTHLY ❑ e.OTHER(Specify): Mzl. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑. b..0.2 g.p.h. ❑ c.OTHER(Specify): <br /> ❑ 3.INVENTORY RECONCILIATION ❑. a.MANUAL PER 23 CCR§2646 ❑. b.STATISTICAL PER 23 CCR§2646.1 W4. <br /> [] 4.WEEKLY MANUAL TANK GAUGING(MIG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M8. <br /> �(5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ &ANNUALLY [Ib.BIENNIALLY 'JFe:OTHER(Specify): 5. WT <br /> .VISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY(treym.agency approval) <br /> ❑ 99.OTHER(Specify) 'fps <br /> : <br /> -n V. PIPE'MONITORING <br /> MONITORING IS PERFORMED USING TI IE FOLLOWING METTIOD(S)(Check all that apply) M30 <br /> -IS,L CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)IrRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: 1,ate.DRY b.LIQUID FILLED ❑. c.UNDER PRESSURE [Id.UNDER VACUUM <br /> PANEL MANUFACTURER: Simq ae4�S _ pM" MODEL#: W3, <br /> LEAK SENSOR MANUFACTURER: Ir G DEIN CSI*7tODEL#(S): O - M35_ <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATT PUMP(i.e.,TURBINE)SHUTDOWN? a YES ❑ b.NO Mas. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC.PUMP SHUTDOWN? ,tea.YES ❑ b.NO Mn. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 &p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): M38. MODEL#(S): 1,139. <br /> .ELECTRONIC LINE LEAK DET�E4VTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> \ g� <br /> ELLD MANUFACTURER: ) FE DEIZQon'I" K-LD M40' MODEL- d 1' 2 - M41_ <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. Max. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? YES ❑ b.NO sou <br /> WILL ELLD FAILUREIDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? �a.YES ❑ b.NO M44, <br /> K4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS. ❑ c.OTHER(Specify) /,111/87ri4n nr L.,45 Mos. <br /> 1r5.VISUAL MONITORING DONE: fit_&DAILY ❑ b.WEEKLY- ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED-- MQ. <br /> •Require vairy approval "Allowed for moniroring ofuni enrergmry gmveror fuel pipingoray per MC§252815(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(ax3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) Mae. <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.