Laserfiche WebLink
e] I::,r_._u L- .nII— eau+m:e,vu:uvursu.—mu,.w...«a—....sFi..e...n. .......,....-v ..............-.....-.... <br />6. TANK FITTINGS_i_NANNOLES AND APPURTENANCES <br />Contractor is responsible to provide proper clearance between tank <br />f. BARRICADING AND DIKING <br />L PIPING <br />b. Flexible connectors, where called for, shell be U.L. approved with (R) <br />PERMIT <br />QI <br />CNET. <br />Contractor should check the installed tank diameter at the opening <br />MARK DATE R■VISI?N• EY J <br />teflon convoluted inner tube encased in stainless steel braid and <br />Tank area must be protected with lighted barricades for safety <br />During vibrating, piping and relating fittings, including sub- <br />coupled with cadmium plated male pipe nipples with an integral hex <br />SCALE <br />OWN. my <br />purposes and to prevent damage to the tanks. Barricades may be <br />merged pump riser, can be installed. Do not install submerged <br />not. <br />IIh� <br />removed after concrete tank pad has been installed and cured. <br />pump until the water ballast has been removed from the tanks. <br />clearance can be adjusted as required. <br />Pump and fill box manholes and/or connecting piping must be <br />Install 4' diameter FRP manway riser, 2'-6" fu length (min.) above <br />C. All pipe, fittings, appurtenances, drop tubes (with 1/8" pressure <br />Berms should be installed around the perimeter of the tank hole to <br />- each tank manway. Bottom of riser should be 6" from the top of <br />equalization hole), manholes (other than sub -pump) and valves are <br />prevent groundwater from running into hole during construction. <br />the tank. Seal the FRP manway riser with filter fabric material <br />to be furnished by the contractor unless specified otherwise in <br />depth sufficient to provide the proper bed and cover, and pitch of <br />around the bottom of the riser P.o prevent sand intrusion into the <br />the addenda or equipment list. <br />S. ROCK AND WATER <br />- <br />riser space. FRP manway riser may be cut to desired depth by <br />chases in the concrete or asphalt paving shall be constructed as <br />detailed on the drawings and as located on the plot plan. The <br />sawing (std. mfg. length is 3'-61 <br />d. Dispensers or self-contained pumps are furnished with a 1-1/2" <br />Where a rock ledge or uncontrollable water condition is encountered in <br />threaded union at the inlet piping connection. <br />the course of excavation, the contractor shall advise the Shell <br />g BACKFILLING TO_SU8_-GRADE <br />adjacent product lines with a tee and 450 elbow as shown on the <br />Engineer immediately and not proceed with the excavation until <br />XV -4 PIPING INSTALLATION <br />determination and agreement is made as to the handling of this work and <br />1) Complete the backfilling to sub -grade with washed clean sand <br />overnight. <br />KV -5 BED <br />the anchorage of tanks. Soft shale or boulders smaller than 1-1/1 cu. <br />in 18" layers using water to compact. <br />1. FIBERGLASS PIPE <br />yds. that can be removed or handled by a power shovel shall be <br />aggregate, clean and free flowing, with particle size not less <br />considered part of the excavation contract and will not be considered <br />2) CAUTION! Tanks may rise while ballasted if backfill is nor <br />Storage and handling, stringing, joining, layout and preparation <br />rock ledge. Contractor shall do all dewatering and pumping required to <br />placed over the tanks and the excavation is flooded by rain <br />for installation, cutting, tapering, bonding, curing, adaptors to <br />remove accumulations of surface water from excavated areas at no <br />or ground water. Water standing on top of the tanks could <br />steel piping or flexible connectors shall be in accordance with <br />additional cost. Underground seepage that can be controlled with a <br />produce a hydraulic action on sand and move the tanks. <br />manufacturer's instructions or recommendations. Contractor must <br />single two inch diameter construction pump will not warrant an extra <br />Insure against this possibility by having the tank hole <br />be familiar with such practices and procedures and follow same <br />charge for pumping. If additional pumping equipment, well pointing or <br />backfilled to ane -grade or keeping the excavation dry from <br />unless certain instructions which are specifically covered in <br />sheeting is required, the contractor shall notify the owner immediately <br />midpoint of tanks to subgrade by pumping during piping. <br />these specifications, i.e., pipe burial, seem to be at variance. <br />regarding the problem, with recommendations for handling and an <br />In such case, Shell's specification will be followed. <br />estimated extra cost to complete the work with appropriate unit prices <br />3) After the sand has been brought to sub -grade, lower water <br />C. Free or organic material, loam, trash, snow or ice. In <br />for material, labor and equipment. <br />level in the tank hole to a level below the top of the tanks <br />All unconnected pipe stubs or runs shall be protected during <br />mechanically compacted in layers of 12" or less to achieve a <br />by pumping from the pipe sumps or well point system. <br />construction against the intrusion of dirt or other foreign <br />6. WATER LEVEL CONTROL <br />material into the piping system. Protective caps used in shipping <br />4, <br />STORAGE AND HANDLIN4 OF BED BACKFILL MATERIAL ON SITE' <br />h.UQ ALITY CONTROL MEASUREMENTS <br />the pipe are suitable if taped in place. <br />Water level should be maintained at or below tank hole bottom during <br />- - - <br />gravels could result in need for mechanical compaction of the <br />the initial phases of the installation. A sump and pump or a system of <br />1) After completion of backfill and sub -grade compaction, remove <br />Where repairs are found to be required during construction or <br />well points and pumps is the recommended method to control water level <br />tank water ballast, enter tanks through manway and sponge dry <br />after testing or inspection, the defective portion of the piping <br />in the hole. The type of system required will depend on water flow <br />interior of tanks. CAUTION! fiberglass tanks should be <br />shall be removed and replaced with appropriate new pipe and <br />rate into the hole. <br />cleared of styrene vapors prior to entering for installation <br />fittings. Repairs such as a sleeve type line patch over a damaged <br />inspections. If an order is present after the water has been <br />pipe or a glass cloth and adhesive build-up over a joint or <br />7. INSTALLATIONPROCEDURE <br />removed from the tanks, a respirator and goggles should be <br />fitting are not acceptable on new work. <br />worn by anyone entering the tanks. Contact the District <br />a. PREPARATION OF_TANK HOLE <br />Engineer for the proper safety procedure. <br />Based on criteria available from manufacturers we have selected <br />the following minimum bending radii for 2" - 4" pipe, which will <br />I) The hole bottom should be level and free of rocks and debris. <br />2) While the tanks are empty, the water table must not be <br />simplify any field calculation for installation of a bead if one <br />allowed to rise higher than the top of the tanks in order to , <br />is required. <br />2) All dry soil conditions: Line tank hole with a clear 8 mil <br />prevent a float -out situation. <br />polyethylene liner, draping the liner beyond the top edge of <br />2. PIPE DIAMETER 2" 3" 4" <br />the hole at least 4'. <br />3) In each tank the Shell Engineer and Contractor shall measure <br />the vertical, horizontal and bottom flattening dimensions at <br />Minimum Bending Radius (Ft) 57 86 115 <br />3) Spread 12" bed of washed sand at a 2"-4" slope toward the <br />both ends and 1/3 distance from each end of the tank. Record <br />Pipe Length/Degree of Bend (Ft) 1 1-1/2 2 <br />fill end in the position where the tanks are to be set. Two <br />the measurements on the inspection form provided. <br />(Example -150 Bend -Pile Length (Ft) 15 22-1/2 30 <br />foot wide strips on the center lines of the tank positions <br />are sufficient. Washed sand shall have no more than 5" fines <br />4) Tank meaaureients not meeting the minimum specifications must <br />To check maximum deflection use the following information as a <br />f <br />q wetiht passing the No. 200 sieve size be well graded <br />be reported twediately to the tank manufacturer before the <br />guide: <br />_and <br />(SW, Unified Soil Classification). <br />tanks can be placed in service. <br />w <br />4) Inspection wells and water level control sumps: Place two <br />i. FINISH_CRADE, <br />MIN. LENGTH MAX. <br />12' sections of 4" slotted (.020" slots or wrap pipe with <br />PIPE SIZE BENDING RADIUS OF PIPE DEFLECTION_ <br />filter fabric when using larger pipe slots or drilled 3/4" <br />1) Install an 8" reinforced concrete tank slab with an 8 mil <br />diameter holes) PVC pipe as manufactured by Hydrophilic <br />polyethylene barrier between the backfill and slab. <br />2" 57' 15' 24" <br />Industries. Inc., or approved equal, vertically, in opposite <br />3" 84' 15' 16.2" <br />corners of tank hole. Install two 12" perforated PVC pipes <br />2) Insure proper street reinforcement is installed as shown 1 <br />4" 108' IS' 12.6" <br />(3/4" diameter holes - 48 holes per lineal foot of pipe) in <br />including the additional reinforcement at the manholes. <br />tank hole as shown in Shell drawing DR -81047. All PVC pipe <br />MALLEABLE 3. GALVANIZED STEEL PIPING (GALVANIZED MALE IRON FITT'.INGS <br />_ ._. ) <br />to be schedule 40. <br />J. INSTALLATION CHECKLIST AND INSPECTION FORM <br />_ _INTERNAL <br />_.Galvanized steel piping has been selected to be used in conjunc- <br />5) Tape or wire to one of the 4" pipe sumps a 2" PVC solid pipe <br />A completed "Installation Checklist and Internal Inspection" form <br />tion with fiberglass piping at such locations where size of the <br />with slotted (.020") perforation on the bottom 12" of the <br />is to be provided the Shell Engineer for approval on completion of - <br />piping, complexity of the arrangement, structure, or aboveground <br />This is to be determine the sand is <br />the tank installation. <br />application precludes the use of fiberglass material. <br />pipe. pipe used to when <br />adequately saturated during the water compaction and <br />vibration process. <br />_ <br />All joints of piping shall be made up with an approved gasoline <br />pipe compound or teflon tape. The latter is preferred. (Litharge <br />%V - GASOLINE PIPING SPECIFICATIONS <br />and glycerine are not approved). All unconnected pipe stubs, <br />b. SETTING TANKS <br />----- ---- <br />risers or runs shall be capped right to prevent tampering or <br />Set tanks on a 12" sand bed or strips and insure the spacing of <br />KV -1 GENERAL <br />intrusion of dirt. The use of a filler material, such as plumbers <br />the tanks is at least 2'-0" from hale side walls and 2'-0" from <br />,; <br />strias in making uimproperly <br />g, g p a pipe joint when threads are cut <br />adjacent tanks. (Note: See 4.b. for unstable wall condition) <br />The contractor accepts full responsibility for <br />p p y proper handling and <br />is unacceptable. <br />installation of the fiberglass or galvanized steel piping and shall r <br />Vent risers, gasoline (or vapor) risers under dispensers, tank <br />C. BACKFILLING <br />insure that good workmanship practices and construction procedures are <br />risers (and manifolds) shall be in accordance with the drawing <br />followed throughout the installation, regardless of the inclusion ordetails. <br />1) Backfill with washed sand to the top of the tanks. <br />omission of any applicable suggestion in these instructions or on the <br />" <br />2) Record the elevation of the top of the end rib on each end of <br />drawings. <br />4. FLEXIBLECO_NNECTO_RS/_SWING JOINTS <br />all tanks. <br />Unknown situations or conditions not covered in these instructions are <br />Flexible connectors or pipe swing joints are to be installed at <br />the responsibility of the contractor. Manufacturer's specialists are <br />the followingpoints. <br />D <br />J) Fill each tank to the midpoint with water. <br />available for consultation. The presence of a Shell or Manufacturer's <br />- <br />4) With a 3" fire hose, thoroughly wet top layer of backfill <br />representative at an installation site does not relieve the contractor <br />a. Tank connections to vents or vapor lines. <br />p <br />of the responsibility for a <br />p y proper installation. <br />over tanks with 1,500-2,000 gallons of water to obtain <br />incremental compaction, Caution must be taken to not place <br />The contractor shall be responsible for proper safeguarding of the <br />b. um Submerged s. <br />g pumps. <br />more than 2.00 allons of water in tank hole at this time. <br />- 8_.-__.___ ._. -_ - <br />installation and materials and equipment stored on the site to prevent <br />C. Between riser(s) under each dispenser and fiberglass <br />5) Complete filling tanks with water. <br />theft, vandalism or damage. <br />pipe <br />gasoline or vapor as may <br />runs for either 8 p y be required. <br />d. WATER JETTING <br />XV-2 SCOPE -OF WORT( - <br />d. Underground at base of vent risers - pipe swing joint only. <br />The piping system to be installed under this section will include <br />Flexible connectors should not be used for making900 bends in (R) <br />1) Using an 8' long 2" FRP pipe attached to a J" hose and <br />product and vent piping and applicable vapor piping as shown on the <br />pressured water supply, saturate the bottom 72" layer of sand <br />r or covered in the addenda to these specifications or on the <br />the piping system, however may be used for some res of mise 11 den - <br />g g <br />between ever other rib and two points under each end ca <br />Y P P� <br />plot plan <br />related piping drawings. Included are appropriate connections and <br />went. <br />Probe the jetting pipe fully into sand. This will wash sand <br />appurtenances to the installed equipment in the complete system, e.g., <br />into existing voids. Atter water Docks up to surface around <br />underground tanks, pumps, dispensers and indicated vapor control or <br />Flexible connectors should be installed so that there is no radial <br />the jetting pipe, slowly remove the pipe and allow the sand <br />recovery equipment. Contractor should refer to the plot plan for the <br />stress or twist in the hose when joints are assembled. <br />to wash into the hole created by the pipe. Care must be <br />orientation of connections at tanks and pipe chases for piping. <br />taken to prevent any s_tandinj water above the sand backfill <br />A pipe swing joint shall he composed of two elbows (or similar <br />during installation. <br />%V-3 PIPING <br />fittings) and a pipe nipple. Close continuously threaded nipples <br />_HATF.R/ALS <br />are not acceptable for underground installation. Typical approved <br />2) Use a gauge stick in the solid 2" PVC pipe to measure the <br />A. Standard suction/pressure and underground vent or vapor piping <br />short nipples, which will allow the use of a pipe wrench on the <br />water level. (See 7.a.4) above) <br />, shall be Underwriters Laboratory, Inc. (U.L,) approved Reinforced <br />body of the nipple between two fittings would be as follows: <br />Thermosetting Resin Line Pipe (RTRP), molded fittings and <br />Pipe Di. (") 1/1 3/4 1 1-1/2 2 <br />D u <br />3) Sand mot be saturated with water to a level of 72" from <br />adapters. Refer to the Approved Material List for currentapproved <br />3 4 <br />Length 2 2 2 2-1/2 <br />bottom of tank hole before mechanical vibration of sand can <br />suppliers and type of grade of system to be used. Fill <br />3 3-1/Z 4 <br />begin. <br />ApproxNipple <br />Installed <br />pipes end other vertical risers et tanks, vent risers, and risers <br />Length. <br />Length (") I 7/8 1-1/8 1-1/2 1-1/2 1-1/8 1-3/4 <br />under dispensers or vapor equipment shall be standard galvanized <br />e. MECHANICAL VIBRATION OF SAND <br />-- - <br />steel pips with fittings standard galvanized malleable iron. <br />S. VENT AND VAPOR PIPING -SLOPE OF LIKES <br />Galvanized malleable iron unions, where called for on the detailed <br />Use a single 1-1/2" hose vibrator and vibrate three points around <br />drawings shall be ground joint construction with brass/brass seat, <br />each end e� and one point between each Vibrate sand between <br />P /8" foot is required in all underground <br />A minimum alma a o[ 1 p q 8 <br />_rib <br />tanks at each rib section. Hose must be worked through sand to <br />150# for above round and 250/300# for below round applications, <br />g g PV <br />we <br />vent and vapor piping, however, the maximum available slope should <br />the bottom of Che tank hole. Allow vibrator to vibrate down, to <br />Galvanized malleable iron coupling$, where required are to be <br />b< used within requirements for cover over g p <br />9 piping and depth of <br />the hole bottom and [hen after 30 seconds withdraw the hose and <br />extra heavy duty. threaded steel pipe <br />close, round, <br />tanks. Pipe cover requirements are detailed on the drawings. <br />P 9 <br />repeat the until all the an has been vibrated Do not <br />h s L 1 sand a <br />Join <br />nipples are to be used underground. Joints <br />used steel piping shell <br />Piping will be installed on pre -graded p <br />led tom acted be m <br />P 8 d scarier. N <br />P B o <br />process <br />p pr _ <br />use vibrators Lamer than 11/2" 00., more than one vibrator . <br />be made up with •n approved gasoline pipe compound or teflon tape. <br />mp <br />o <br />support or spacing materiel other than the bed and back Piil will <br />After vibrating, check for tank movement by recording the eleva- <br />be left in contact with the piping. This method of installation <br />on the end ribs of she tanks. <br />should prevent the possibility of any sage or humps which would <br />,tions <br />trap the lines and which will not be permitted. <br />U <br />e] I::,r_._u L- .nII— eau+m:e,vu:uvursu.—mu,.w...«a—....sFi..e...n. .......,....-v ..............-.....-.... <br />6. TANK FITTINGS_i_NANNOLES AND APPURTENANCES <br />Contractor is responsible to provide proper clearance between tank <br />NOTE: <br />NOT ALL SECTIONS OF THESE SPECIFCATiONS . <br />APPLY TO THIS JOB. REFER TO PLANS FOR <br />APPLICABLE SECTIONS. <br />n <br />shell and submerged pumps or fill tubes. (Refer also to tank <br />- <br />installation specifications, Section x[v, paragraph 14). <br />PERMIT <br />QI <br />CNET. <br />Contractor should check the installed tank diameter at the opening <br />MARK DATE R■VISI?N• EY J <br />into which the pump or tube is being installed and make necessary <br />adjustments to maintain the specified clearance of 4" (max -5"). <br />When installing fillboxes or vapor adaptors, contractor should <br />SCALE <br />OWN. my <br />provide a minimum of 3" (max. -4") clearance between the top of the <br />cap and bottom of the manhole cover. The drawings call for a <br />IIh� <br />coupling to be installed near the top of each riser so that this <br />clearance can be adjusted as required. <br />Pump and fill box manholes and/or connecting piping must be <br />self-supporting and not contact the tank. Do not place any <br />spacing material on the top of the tank for any reason. <br />7. <br />TRENCHING AND PIPE CHASES <br />Trenching width will be sufficient to maintain the clearance <br />between pipes and side walls as shown on the drawings and of a <br />depth sufficient to provide the proper bed and cover, and pitch of <br />lines. Note that the minimum cover to finish grade over product <br />lines outside the concrete island mat area is Winches. Pipe <br />chases in the concrete or asphalt paving shall be constructed as <br />detailed on the drawings and as located on the plot plan. The <br />minimum spacing between adjacent pipes is 5", however piping runs <br />will not be layered. Where piping runs must cross, a 5" vertical <br />dimension between pipes should also be maintained. The exception <br />to this rule is where a branch line to a dispenser crosses <br />adjacent product lines with a tee and 450 elbow as shown on the <br />detail showing the dispenser piping. <br />All open trenches shall be properly barricaded and designated to <br />insure public safety. No trench shall be left open and unmarked <br />overnight. <br />KV -5 BED <br />AND BACKFILL MATERIAL <br />1. <br />GRAVEL - STANDARD <br />Standard bed and backfill material should be naturally -rounded <br />aggregate, clean and free flowing, with particle size not less <br />than 1/8" or more than 3/4" in diameter. Use this description <br />when specifying or ordering because material is known by different <br />areas. This material is commonly called pea gravel. This is, the <br />some material as specified for the tank installation and is <br />classified as a self -compacting material. , <br />2. <br />ALTERNATE - STONE OR GRAVEL CRUSHINGS <br />Stone or gravel crushings with angular particle size not less than <br />1/8" or more than 1/2" in diameter, washed and free flowing is <br />acceptable as an alternate material, This material must meet ASTM <br />C-33 paragraph 9.1 requirements for quality and soundness and to <br />also classified as a self -compacting material. <br />3. <br />ALTERNATE - SAND <br />Sand must be clean, washed, inert, well -graduated and have the <br />following characteristics: <br />A. Lens than 81 by weight passing 0200 sieve. Such fines must <br />be nonplastic. <br />b. 1/8" diameter or less particle size. <br />C. Free or organic material, loam, trash, snow or ice. In <br />freezing weather must be kept dry. <br />Sand is not a self -compacting material and will have'to be <br />mechanically compacted in layers of 12" or less to achieve a <br />minimum 90% Standard Proctor Density throughout. Use a mechanical <br />plate -type vibrator (2000-3000 vibrations/minute). Do not use a <br />concrete vibrator or water taping. <br />4, <br />STORAGE AND HANDLIN4 OF BED BACKFILL MATERIAL ON SITE' <br />Do not allow bed/backfill material to intermix with an excavated <br />soil or other material on site. Contamination of self -compacting <br />gravels could result in need for mechanical compaction of the <br />minimum/maximum particle sizes specified are critical for self - <br />compaction. <br />In freezing conditions materials must be kept dry and free of ice. <br />NOTE: <br />NOT ALL SECTIONS OF THESE SPECIFCATiONS . <br />APPLY TO THIS JOB. REFER TO PLANS FOR <br />APPLICABLE SECTIONS. <br />n <br />CATS APFAWC <br />PRELIM. <br />- <br />PERMIT <br />QI <br />CNET. <br />MARK DATE R■VISI?N• EY J <br />311NORAL SPINPICIFICATIONS FOR <br />M093UL,AR CONS'T`RUCTION ' <br />14446 No PERSHING AVENUE <br />STOCKTON, CA. <br />SHELL OIL COMPANY <br />IC N RTHW ■T DISTRICT <br />PACIp O ■ <br />0W.I,C.*4, <br />SCALE <br />OWN. my <br />,, <br />4 <br />RHL/ 649 1' : <br />20 J ?4-24. <br />ROBERT H. LEE & ASSOCIATES, INC. <br />AAOMITNDi49N PLANNING' ANnlNSRRINm <br />1909 NOW&AVaNUW,0011, mACRAMmNTO, CA 2681815. 16101 moa 9003 <br />IIh� <br />/mom <br />}arp�aJn7. <br />�Y� !m/ <br />