My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
INSTALL_1998 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:24 AM
Creation date
11/6/2018 10:24:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PERSHING\4501\PR0231233\INSTALL PLAN 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERFORMANCE SPECIFICATION - CONTINUED $ <br /> SECTION IX CANOPIES - CONTINUED " <br /> PART 3 - EXECUTION -CONTINUED v <br /> 3.1.17 FABRICATION DRAWINGS SHALL BE DELIVERED TO APPLICABLE CONSTRUCTION OFFICE Z <br /> A MINIMUM OF 4 WEEKS PRIOR TO COMMENCEMENT OF CONSTRUCTION. NO WORK <br /> SHALL COMMENCE PRIOR TO APPROVAL OF DRAWINGS BY SOUTHLAND'S CONSTRUCTION <br /> REPRESENTATIVE. m <br /> a <br /> 3.2 EXECUTION: N <br /> 3.2.1 COORDINATE DELIVERY AND INSTALLATION WITH GENERAL GASOLINE INSTALLER W <br /> THROUGH LOCAL CONSTRUCTION OFFICE. MATERIALS SHALL BE STORED AT POSITION AS 2 <br /> INDICATED BY GENERAL GASOLINE INSTALLER. ~ <br /> 3.2.2 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING FOOTING ANCHOR dd <br /> BOLTS AND TEMPLATE FOR DELIVERY TO GENERAL GASOLINE INSTALLATION CONTRACTOR <br /> 2 WEEKS PRIOR TO INSTALLATION, SIZE IN ACCORDANCE WITH SHOP DRAWINGS AND IN <br /> ACCORDANCE WITH GASOLINE INSTALLING CONTRACTOR'S SCHEDULE OF CONSTRCUNON. <br /> 3.2.3 FOOTINGS FOR CANOPY AND PLACEMENT OF ANCHOR BOLTS SHALL BE PERFORMED BY <br /> GENERAL GASOU NE INSTALLER AS PER APPROVED SHOP DRAWINGS, TYPE OF CONCRETE <br /> SHALL BE AS PER SHOP DRAWINGS. TYPE, SIZE, AND PLACEMENT OF ALL REINFORCED <br /> STEEL SHALL BE AS PER SHOP DRAWINGS. <br /> 3.2.4 THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK AND <br /> NOTIFY SOUTHLAND'S CONSTRUCTION REPRESENTATIVE IMMEDIATELY OF ANY DISCREPANCIES <br /> FOUND. REFER TO SITE PLAN FOR SIZE, TYPE AND PLACEMENT OF CANOPY, <br /> 3.2.5 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR BEING PROPERLY LICENSED IN <br /> LOCAL INSTALLATION AS WELL AS PROVIDING OWN PERMITS AS MAY BE REQUIRED. A <br /> COPY OF THE PERMIT MUST BE ON FILE IN THE LOCAL CONSTRUCTION OFFICE PRIOR <br /> TO COMMENCING WORK. <br /> 3.2.6 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING CONSTRUCTION OFFICE vt <br /> WITH ACCEPTABLE INSURANCE AS REQUIRED PER SOUTHLAND CORPORATION INSURANCE o <br /> SPECIFICATIONS AND STANDARD CONTRACT FOR CONSTRUCTION. INSURANCE SHALL BE <br /> U <br /> IN EFFECT FOR DURATION OF WORK. 4 <br /> 3.2.7 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL WORK OF <br /> w <br /> OTHER CONTRACTORS ALREADY IN PLACE, AS MAY BE REQUIRED. <br /> 3.2.8 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING AND OBTAINING <br /> APPROVAL OF GENERAL. GASOLINE CONTRACTOR PRIOR TO PLACING OF ANY HEAVY <br /> EQUIPMENT ON TOP OF CONCRETE WORK ALREADY IN PLACE. <br /> 3.2.9 ALL FOOTINGS SHALL BE ON FIRMI UNDISTURBED SOILS OR FILL COMPACTED <br /> TO 95% MAXIMUM DENSITY BASED ON A.S.T.M. D 1557-70. IF ANY POOR SOIL z m m o U <br /> CONDITION IS DISCOVERED DURING EXCAVATION, THE DESIGN ENGINEER SHALL BE W4u LL <br /> NOTIFIED IMMEDIATELY FOR SOIL BEARING VERIFICATION. N s � O <br /> 3.2.10 SUPPORTING COLUMNS SHALL BE PLACED AS PER SOUTHLAND GASOLINE PLANS AND 2�J�d� y'LP�� <br /> AS PER APPLICABLE SITE PLAN. <br /> 3.2.11 CANOPY SUPPORT COLUMNS SHALL BE CAPPED AT TOP. <br /> 3.2.12 ALL MATERIALS SHALL BE ALIGNED TRUE AND FLAT AND ALL PLANES SHALL BE <br /> FLAT, TRUE TO ESTABLISHED LINES WITH ALL SOFFITS BEING LEVEL AND VERTICAL M <br /> WALLS CORRECT AND ACCEPTABLE. PARAPET FASCIA SHALL BE VERTICAL AND PLUMB. M <br /> h Z <br /> ALL INTERSECTIONS SHALL BE TRUE AND STRAIGHTEDGE LINES. MATERIALS SHALL BE > G <br /> LEFT IN ACCEPTABLE CONDITION TO BE PAINTED BY OTHERS. ALL METAL SHALL BE U <br /> FREE OF DEBRIS AS MAY BE REQUIRED FOR FINAL PAINTING/FINISHING. j ? <br /> S J � <br /> 3.2.13 INSTALLING CONTRACTOR SHALL BE RESPONSIBLE FOR POURING OF CONCRETE ¢ tn u CL <br /> AROUND CANOPY COLUMNS, COVERING ANCHOR BOLTS AS MAY BE REQUIRED. <br /> Z a i <br /> 3.2.14 CANOPY CONTRACTOR SHALL LEAVE ALL EXPOSED STRUCTURAL STEEL FREE OF j z <br /> DEBRIS, PRIMED AND READY FOR FINAL PAINTING BY GASOLINE CONTRACTOR. U 0 <br /> w <br /> 3.3 RESPONSIBILITIES OF GENERAL GASOLINE CONTRACTOR: I Lo w <br /> a rn a <br /> 3.3.1 SHALL BE RESPONSIBLE FOR A MINIMUM OF 30 DAY NOTIFICATION OF DATE WHEN <br /> SITE WILL BE READY FOR INSTALLATION OF GASOLINE CANOPY. <br /> 3.3.2 UPON AGREED DATE BETWEEN GASOLINE CONTRACTOR AND CANOPY CONTRACTOR, <br /> THE SITE SHALL BE FREE OF MATERIAL, MOVABLE EQUIPMENT AND DEBRIS, LEVEL AND ? <br /> IN PROPER CONDITION FOR CANOPY INSTALLATION. GENERAL GASOLINE CONTRACTOR <br /> SHALL PERFORM SITE WORK AS MAY BE REQUIRED TO COMPLY. <br /> 3.3.3 GASOLINE CONTRACTOR SHALL NOT INSTALL GASOLINE DISPENSERS PRIOR TO CANOPY <br /> N <br /> � ERECTION, UNLESS AGREED UPON IN WRITING BETWEEN THE CANOPY INSTALLER AND <br /> v GASOLINE INSTALLER. <br /> E <br /> ° 3.3.4 GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF CANOPY = <br /> hc O <br /> FOOTINGS AS DESIGNED IN SHOP DRAWINGS PROVIDED BY CANOPY MANUFACTURER, A <br /> PROVIDING ALL STEEL, ETC., (WITH THE EXCEPTION OF ANCHOR BOLTS TO BE <br /> PROVIDED BY CANOPY INSTALLER). FOOTINGS SHALL BE POURED IN A SUFFICIENT <br /> AMOUNT OF TIME, SO PROPER CURING TIME IS ALLOWED. <br /> 3.3.5 GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING OF ALL METAL AND <br /> TRIM AS RELATED TO THE GASOLINE CANOOPY AS PER STANDARD COLOR REQUIREMENTS. <br /> 3.3.6 GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WIRING AND INSTALLATION w <br /> OF LIGHTS, SIGNS, SECURITY LIGHTS, ETC., IN CONJUNCTION WITH NORMAL <br /> N <br /> GASOLINE INSTALLATION. z <br /> 3.3.7 GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR LEAVING BLOCKOUTS AS MAY <br /> BY REQUIRED FOR INSTALLATION OF CANOPY IN ACCORDANCE WITH SHOP DRAWINGS, p - <br /> AND PLACEMENT OF ANCHOR BOLTS IN ACCORDANCE WITH SHOP DRAWINGS AS RELATED <br /> °' THERETO. <br /> 0 3.4 WARRANTIES: CANOPY CONTRACTOR SHALL WARRANTY, IN WRITING, COMPLETE CANOPY <br /> INSTALLATION FOR A MINIMUM PERIOD OF 2 YEARS, A 5 YEAR WARRANTY <br /> GUARANTEEING INSTALLATION TO BE FREE OF DESIGN AND INSTALLATOIN DEFECTS. DATE: 15JUL97 <br /> INCLUDINGS ACTS OF MAN, GOD AND NORMAL WEAR AND TEAR, SHALL BE COVERED. <br /> 3.5 CLFAN-UP: CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR CLEAN-UP AND PROJECT NO: <br /> REMOVAL FROM SITE ALL TRASH AND DEBRIS RESULTING FROM WORK RELATING TO 3010.20 <br /> INSTALLATION OF CANOPY, DRAWN: MSP <br /> APPROVED: CL <br /> DRAWINO <br /> FSP-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.