Laserfiche WebLink
%%.V *Md <br /> SWRCB,January 2002 Page I of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer P7 Industry Standard Professional Engineer <br /> F_ Other(Specify) <br /> Test Method Used By: R Pressure r Vacuum C Hydrostatic <br /> F Other(Specify) <br /> Test Equipment Used: gauge Equipment Resolution: 20 psi <br /> (rank motor oil- (Tank gear oil GEAR (Tank waste oil tank (Tank and freeze- <br /> MOTOR 011.)STP OIL)STP Containment pad-WASTE OIL) ANTIFRE,EZE)S 17P <br /> Containment I to STP I to STP Containment STP Containment I to Containment I to STP <br /> Piping Material: Containment I I STP Containment I Containment I <br /> Piping Manufacturer: dw fiberglass dw fiberglass dw fiberglass dw fiberglass <br /> Piping Diameter: smith smith smith smith <br /> Length of Piping Run: 3 in. 3 in. 4 in. 3 in- <br /> Product Stored: 30 R 30 ft. 10 R 30 ft. <br /> Method and location of MOTOR OIL GEAR OB. WASTE OIL ANTIFREEZE <br /> i in -run isolation: <br /> Wait time between applying sump sump sump sump <br /> pressure/vacuum/water and <br /> starting test: 5 min 5 min 5 min 5 min <br /> Test Start Time: <br /> Initial Reading(Rtk 09:50:00 09:50:00 10:59:00 09:50:00 <br /> Test End Time: 3.00000 PSI 3.00000 PSI 3.00000 PSI 3.00000 PSI <br /> Final Reading(RF)t 10:50:00 10:50:00 11:59:00 10:50:00 <br /> Test Duration: 3.00000 PSI 3.00000 PSI 3.00000 PSI 3.00000 PSI <br /> Change in Reading(RF-Rt): I hr I hr I hr I hr <br /> Pass/Fail Threshold or 0.00000 PSI 0.00000 PSI 0.00000 PSI 0.00000 PSI <br /> Criteria: <br /> Test Result: +/-0.00000 +/-0."M +/-0.00000 +/-0.00000 <br /> Pass Pass Pass :Pass' <br /> COMMellts-(include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br /> unable to test t-I u/o secondary line due to bad boot. <br /> WO:2314332 <br />