My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2012 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:11:02 PM
Creation date
11/6/2018 10:35:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2014
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2012 - 2014 .PDF
QuestysFileName
COMPLIANCE INFO 2012 - 2014
QuestysRecordDate
12/8/2016 9:18:09 PM
QuestysRecordID
3274874
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%%.V *Md <br /> SWRCB,January 2002 Page I of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer P7 Industry Standard Professional Engineer <br /> F_ Other(Specify) <br /> Test Method Used By: R Pressure r Vacuum C Hydrostatic <br /> F Other(Specify) <br /> Test Equipment Used: gauge Equipment Resolution: 20 psi <br /> (rank motor oil- (Tank gear oil GEAR (Tank waste oil tank (Tank and freeze- <br /> MOTOR 011.)STP OIL)STP Containment pad-WASTE OIL) ANTIFRE,EZE)S 17P <br /> Containment I to STP I to STP Containment STP Containment I to Containment I to STP <br /> Piping Material: Containment I I STP Containment I Containment I <br /> Piping Manufacturer: dw fiberglass dw fiberglass dw fiberglass dw fiberglass <br /> Piping Diameter: smith smith smith smith <br /> Length of Piping Run: 3 in. 3 in. 4 in. 3 in- <br /> Product Stored: 30 R 30 ft. 10 R 30 ft. <br /> Method and location of MOTOR OIL GEAR OB. WASTE OIL ANTIFREEZE <br /> i in -run isolation: <br /> Wait time between applying sump sump sump sump <br /> pressure/vacuum/water and <br /> starting test: 5 min 5 min 5 min 5 min <br /> Test Start Time: <br /> Initial Reading(Rtk 09:50:00 09:50:00 10:59:00 09:50:00 <br /> Test End Time: 3.00000 PSI 3.00000 PSI 3.00000 PSI 3.00000 PSI <br /> Final Reading(RF)t 10:50:00 10:50:00 11:59:00 10:50:00 <br /> Test Duration: 3.00000 PSI 3.00000 PSI 3.00000 PSI 3.00000 PSI <br /> Change in Reading(RF-Rt): I hr I hr I hr I hr <br /> Pass/Fail Threshold or 0.00000 PSI 0.00000 PSI 0.00000 PSI 0.00000 PSI <br /> Criteria: <br /> Test Result: +/-0.00000 +/-0."M +/-0.00000 +/-0.00000 <br /> Pass Pass Pass :Pass' <br /> COMMellts-(include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br /> unable to test t-I u/o secondary line due to bad boot. <br /> WO:2314332 <br />
The URL can be used to link to this page
Your browser does not support the video tag.