My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2012 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:11:02 PM
Creation date
11/6/2018 10:35:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2014
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2012 - 2014 .PDF
QuestysFileName
COMPLIANCE INFO 2012 - 2014
QuestysRecordDate
12/8/2016 9:18:09 PM
QuestysRecordID
3274874
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> S WRCB,January 2002 Page 2 of 2 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: r Piping Manufacturer rO- Industry Standard r Professional Engineer <br /> r Other(Specify) <br /> Test Method Used By: Pressure r Vacuum r Hydrostatic <br /> r Other(Specify) <br /> Test Equipment Used: gauge Equipment Resolution: .20 psi <br /> (Tankwash s.Ivant- (Tank.waste oil new <br /> WASH SOLVFN'I) . gate-WASTEOIL) <br /> STP Containment t to STP Containment I to <br /> Piping Material: STP Containment I STP Contai mnent 1 <br /> Piping Manufacturer: dw fiberglass dw fiberglass <br /> Piping Diameter: smith smith <br /> in. n. <br /> Length of Piping Run: 3 in. 3 in. <br /> Product Stored: 20 R. 70 R <br /> Method and location of WASH SOLVENT WASTE OIL <br /> piping-run isolation: <br /> Wait time between applying sump sump <br /> pressure/vacuum/water and min min <br /> starting test: 5 min 5 min <br /> Test Start Time: <br /> Initial Reading(R17 12:14:00 15:20:00 <br /> Test End Time: 3.00000 PSI 3.00000 PSI <br /> Final Reading(RF): 13:14:00 16:20:00 <br /> Test Duration: 3.00000 PSI 3.00000 PSI <br /> Change in Reading(RF-Ri): I hr 1 hr <br /> Pass/Fail Threshold or 0r:!+/7�O <br /> 00000 PSI 0.00000 PSI <br /> Criteria: +/-00000 +/_0.00000 <br /> Test Result: <br /> Pass Pass <br /> COMMentS-(include information on repairs made prior to testing,and recommended follow-up forfailed tests) <br /> unable to test t-1 u/o secondary line due to bad boot. <br /> WO:2314332 <br />
The URL can be used to link to this page
Your browser does not support the video tag.