Laserfiche WebLink
SWRCB,January 2002 <br /> Page 2 of 2 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: FI Tank Manufacturer C✓i Industry Standard Professional Engineer <br /> F Other(Specify) <br /> Test Method Used By: r Pressure Vacuum r Hydrostatic <br /> r Other(Specify) <br /> Test Equipment Used: VPLT Equipment Resolution: 0.00001 in. <br /> STP Containment for <br /> Tank waste oil new <br /> ate WASTE OIL-I <br /> Sump Diameter/Dimensions: 48 in. in. In in <br /> Sump Depth: 124.00 in. is in. in. <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 2600 <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 23.00 <br /> Condition of sump prior to testing: good <br /> Portion of Sump Tested' 28 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both F Yes M No M NA 0 Yes 0 No l-' NA r Yes OF Nor NA 9 Yes B No 0 NA <br /> product and water)?* <br /> Turbine shutdown response time 02:00:00 sec sec sec sec <br /> Is system programmed for fail-safe <br /> shutdown?* C yes O No O NA f Yes C No O NA r Yes 6'. Nor NA f yes r No C NA <br /> Was fail-safe verified to be <br /> o ational?" (7 Yes 00 No NA Yes T Nor NA C Yes(' No NA Yes R$ Nor NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min min min min <br /> test <br /> Test Start Time: 15:40:00 <br /> Initial Reading(RI): 0.00000 in. <br /> Test End Time: 16:10:00 <br /> Final Reading(RF) -0.00130 in. <br /> Test Duration: 30 min <br /> Change in Reading(RF-RI): -0.00130 in. <br /> Pass/Fail Threshold or Cntena: +/-0.00200 <br /> Test Result: Pass <br /> Was sensor removed for testing? Yes C No C NA (" Yes C No(-' NA (" Yes f' Vo T NA (` Yes e No C" NA <br /> Was sensor properly replaced and Yes f Nor NA f?'C Yes r No f' NA eyes r No 0, NA r Ycs r No(- NA <br /> verified functional after testing, <br /> COtt MentS-(include information on repairs made prior to testing, and recommendedfollow-up forfailed tests) <br /> u/o sump near rack was not tested due to bad secondary line boot. <br /> ' If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. <br /> WO:2314332 <br />