My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2012 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:11:02 PM
Creation date
11/6/2018 10:35:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2014
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2012 - 2014 .PDF
QuestysFileName
COMPLIANCE INFO 2012 - 2014
QuestysRecordDate
12/8/2016 9:18:09 PM
QuestysRecordID
3274874
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•S WRCB,January 2002 Page I of 1 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: r Piping Manufacturer r Industry Standard r Professional Engineer <br /> r- Other(Specify) <br /> Test Method Used By: r Pressure (- Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: gauge Equipment Resolution: .20 psi <br /> (Tank wayteadhnear .• " .'r . , .......... _77 • . <br /> rack=WASTE OIL, r <br /> STP Containment Ito <br /> Piping Material: STP Containment,I <br /> Piping Manufacturer: dw fiberglass <br /> Piping Diameter: smith in. in, N. <br /> Length of Piping Run: 3 in. ft, ft, ft. <br /> Product Stored: 10 ft. <br /> Method and location of WASTE OIL <br /> i in -run isolation: <br /> Wait time between applying sump <br /> pressure/vacuum/water and min min min <br /> starting test: 5 min <br /> Test Start Time: <br /> Initial Reading(Rt): 13:21:00 <br /> Test End Time: 3.00000 PSI <br /> Final Reading(RF): 14:21:00 <br /> Test Duration: 3.00000 PSI <br /> Change in Reading(RP-RI): I hr <br /> Pass/Fail Threshold or 0.00000 PSI <br /> Criteria: <br /> +/-0.00000 <br /> Test Result <br /> Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO:2315605 <br />
The URL can be used to link to this page
Your browser does not support the video tag.