My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2012 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:11:02 PM
Creation date
11/6/2018 10:35:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2014
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2012 - 2014 .PDF
QuestysFileName
COMPLIANCE INFO 2012 - 2014
QuestysRecordDate
12/8/2016 9:18:09 PM
QuestysRecordID
3274874
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�Wo *00 <br /> S WRCB,January 2002 Page I of 1 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: r Tank Manufacturer F Industry StandardProfessional Engineer <br /> r Other(Specify) <br /> Test Method Used By: r Pressure F Vacuum Hydrostatic <br /> F Other(Specify) <br /> Test Equipment Used: VPLT Equipment Resolution: 0.00001 in. <br /> STP Containment for <br /> Tank waste oil near <br /> rack WASTE OIL-1 <br /> Sump Diameter/Dimensions: 48 in. in. in, in <br /> Sump Depth: 56.00 in. in. in. in. <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: 18'00 <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 22'00 <br /> Condition of sump prior to testing: good <br /> Portion of Sump Testedl 20 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both r Yes r No o NA r Yes r Nor NA r Yes r No 0 NA C Yes r Nor NA <br /> product and water)?* <br /> Turbine shutdown response time 00:00:00 sec sec sec see <br /> Is system programmed for fail-safe r Yes r No Rr NA r Yes r Nor NA r Yes r Nor NA r Yes C Nor NA <br /> shutdown?* <br /> Was fail-safe verified to be <br /> operational?* r yes r No IT NA r Yes r No ft" NA r Yes r Nor NA r Yes C, No C NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min min min mm <br /> test <br /> Test Start Time: 13:21:00 <br /> Initial Reading(Rl): 0.00000 in. <br /> Test End Time: 13:51:00 <br /> Final Reading(RF)-' -0.00110 in. <br /> Test Duration: 30 min <br /> Change in Reading(RF-RI): -0.00110 in. <br /> Pass/Fail Threshold or Criteria: +/-0.00200 <br /> Test Result: Pass <br /> Was sensor removed for testing? r Yes r No r NA r Yes r No NA r Yes r No r NA r Yes r No r NA <br /> Was sensor properly replaced and (P Yes C No r NA r Yes O' Nog NA C Yes r No r NA d3' Yes 6 No r NA <br /> verified functional after testing? <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for foiled tests) <br /> If the entire depth of the sump is not tested,specify how much was tested.if the answer to any of the questions indicated with an <br /> asterisk(•)is"NO"or"NA",the entire sump must be tested. <br /> WO:2315605 <br />
The URL can be used to link to this page
Your browser does not support the video tag.