My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2012 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:11:02 PM
Creation date
11/6/2018 10:35:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2014
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2012 - 2014 .PDF
QuestysFileName
COMPLIANCE INFO 2012 - 2014
QuestysRecordDate
12/8/2016 9:18:09 PM
QuestysRecordID
3274874
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.� <br /> D.Results of Testing/Servicing <br /> Software Version Installed: 327.04 <br /> Complete the following checklist: <br /> • Yes No* Is the audible alarm operational? <br /> • Yes No* Is the visual alarm operational? <br /> • Yes No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> • Yes No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere witt <br /> heir proper operation? <br /> • Yes No* f alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> • N/A <br /> Yes r No* or pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring <br /> em detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check <br /> • N/A 11 that apply)r Sump/Trench Sensors; r Dispenser Containment Sensors. <br /> you confirm m positive shut-down due to leaks and sensor failure/disconnection?(' Yes; r No <br /> Yes r No* ror tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill <br /> revention valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If <br /> IT N/A at what percent of tank capacity does the alarm trigger?% <br /> • Yes* r No Nas any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> nufacturer name and model for all replacement parts in Section E below. <br /> Yes* r No tas liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) <br /> Product; r Water.If yes,describe causes in Section E below. <br /> • Yes f No* Nas monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> • Ya No* s all monitoring equipment operational per manufacturers specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E Co ments: <br /> die sump 1 by rack 205 sensor passed.die sump 2 by tank pad 205 sensor passed.1-13 annular 407 sensor passed. <br /> Monitoring System Certification Page 3 of 4 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.