Laserfiche WebLink
F.In-Tank Gauging/SIR Equipment: P Check this box If tank gauging is used only for inventory control. <br /> r Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> • Yes f' No* as all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> • Yes f No' Nere all tank gauging probes visually inspected for damage and residue buildup? <br /> G. Yes f' No' Nas accuracy of system product level readings tested? <br /> • Yes No' Nas accuracy of system water level readings tested? <br /> IT Yes No* Afere all probes reinstalled properly? <br /> IT Yes No* Nere all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes F No* or equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check all that <br /> r <br /> N/A pply)Simulated leak rate: 3 g.p.h.; r 0.1 g.p.h; I 0.2 g.p.h. <br /> Yes r No* Nere all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes No* Nas the testing apparatus properly calibrated? <br /> Yes (^ Nos r mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> r N/A <br /> Yes (' No* r electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> Yes r- For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ( N/A <br /> Yes F No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> f N/A <br /> Yes (' Nos For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ( N/A <br /> Yes (� No* ere all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 4 of 4 12107 <br />