Laserfiche WebLink
NEW USMSTALLATION INSPECTION REq&D <br /> FACILITY NAME: co "--I- ADDRESS: <br /> SWEEPS9 TANKS ULi TANK MCDEL/MATERIAL: S <br /> CAPACITY: 2 PRODUCT: . 1 R.E-H.S: �i . <br /> A I IV <br /> P N ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P I WITH MANUFACTURER MITTEN SPECIFICATIONS <br /> R T <br /> O I <br /> V A <br /> E L <br /> D S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br /> 2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br /> INITIAL INSPECTIONS <br /> 7y <br /> S 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: S11P: PSI: HRS/MIN: BRINE(LIOUIO ANNULAR): OTHER- <br /> 2 4. PRIMARY TANK TEST: PSI: '1�` HRS/MIN: <br /> 5. TANK APPROPRIATELY PLACID WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br /> PIPING INSPECTIONS <br /> �- 6. PRIMARY PIPING TEST (MINI" 40 PSI/30 MIM) (CCR 2635 (B) (4)) <br /> - 7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCH 2635 (A) (4)) <br /> 8_ LAKE TEST ON ALL SUPS (24 HR. MINIUM) HRS: (CCR 2635 (A)) <br /> - 5- <br /> -� 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br /> 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br /> Vil 11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br /> FINAL INSPECTION <br /> 12- PERFORMANCE TEST FOR 'ALL' MONITORING PROBES (CCR 2632 (C) (2)) <br /> 11-O 5 ✓ 13_ PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br /> 1 !� 14. PERFORMANCE TEST OF LIME LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br /> 15. PERFORMANCE TEST OF AUTOMATIC PUP SYSTEM SHUT-OFF (CCR 2635 (B) (5)) <br /> 16. HALL FLOAT VALVES INSTALLED (CCR 2635 (B) (6)) <br /> 17_ OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br /> - klahll"- <br /> TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) (CCR 2631 (0) (5)) <br /> 19. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br /> 20. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (E) (1) (2)) <br /> 21. 'C' FORM COMPLETED AND SIBMITTED (CCR 2635 (E)) <br /> 22_ MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2641-26.4) <br /> ./ 23_ ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284 (E) (F)) <br /> COMMENTS: <br /> EH23406 3/92 (REVISED 11\92) <br /> 3 <br />