Laserfiche WebLink
FACILITY NAME: NEW US- 'NSTALLATION INSPECTION RE OIL) <br /> ADDRESS: <br /> SLEEPS' TAN 'e C //- <br /> ULt <br /> CAPACITY: TANK MOD EL111ATERIAI: <br /> PRODUCT: <br /> R.E-H_S: <br /> A I <br /> P M <br /> P I ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> R T WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> O I <br /> V A <br /> E L <br /> D S <br /> DATE ITEM OR EQUIPMENT INSTECi ED <br /> 1. UST PLANS SUBMITTED/ FEES PAID <br /> ( <br /> 2- UST INSTALLATION PUPS APPROVED H+S CODE 25787, CC2 2635 (D) (8) <br /> CCCR 2635 <E) (g)) <br /> INITIAL INSPECTIONS <br /> INSPECTION AND TEST OF SECONDARY CONTAINMENT: <br /> HO_IOAT: <br /> VACIJUM: SOAP: Psi: <br /> HRS/MIN: BRINE(LIQUID ANNULAR): <br /> <- PRIM"7 TANK TEST: OTHER: <br /> ��,^ PSI: HRS/MIM: <br /> �{'I 5• TANK APPROPRIATELY PLACID WITH APPROVED RACLL (CCR 2535 (A) (3) (4) (6)/ API/PEI) <br /> PIPING INSPECTIONSIONS <br /> 6• PRIMARY PIPING TEST (NIMIMOI 40 PSI/30 MIN) <br /> f <br /> 7- (CO2 2635 (H) (4)) <br /> SECONDSECONDARY PIPING CONTAINMENT TEST PSI: <br /> HRS/MIN: OTHER: (CCR 2635 (A) (4)) <br /> — _ � 8• LAKE TEST ON AlL SUPS (2< NR- MIMIMLM) <br /> --6 9- UNUSED TANK OPENINGS <br /> SEALED ANO CORNRS: (CCR 2635 (A)) <br /> ROSION PROTECTED (CM 2635) <br /> OVERSPILL PERFORMANCE TEST <br /> ALL PIPING AND FITTINGS (� 2635 (A) (4)) <br /> CORROSION PROTECTED <br /> (CCR 2635 (H)) <br /> FINAL INSPECTION <br /> ✓ <br /> EMI <br /> 12 PERFORMANCE TEST FOR 'ALL' MONITORING PRONES <br /> 13- PERFORMANCE TEST OF C7MTIMUAIS MONITORING SYSTEM (PAMEL) 2632 (C) (2)) <br /> 14_ PERFORMANCE TEST OF LINE LEAK DETECTION (CQ 2632 (A) (2)) <br /> 15• PERFORMANCE TEST OF AUTOMATIC PRS STSTEM SHUT-OFF CCS 2632 (0) 2635 (H) (5)J <br /> •^'I Ct:Ct 2635 (B) (5)) <br /> BALL FLOAT VALVES INSTALLED <br /> (CO2 2635 (B) (6)) <br /> 17. OVERFILL PROTECTION IMSTALJ-ED/,{ppgOyED <br /> (CCR 2535 (E) (2)) <br /> 18_ TANK ACCESS PUNTS BROUGHT TO GRADE <br /> (LOCll'O ARID YATERTIGHT) (CO2 2631 (D) (5)) <br /> (I ' 19• TANK INTEGRITY TEST (PASSING HARD COPY) <br /> (CCR 2635 (A) (5)) <br /> 20. MONITORING PLAN, RESPONSE PUN AND LCC gOpK ON SITE <br /> (CCR 2632 (E) (1) (2)) <br /> 21. •C` FORMCOPLE'T® AIR) 41811ITTID <br /> (CO2 2635 (E)) <br /> 22• MONITORING METifm FON ALL TANKS AND PIPING APPROVED <br /> (CCR 2641-2644) <br /> 23- ALL CONDITIONS MET; FACIL177 PERMIT ISSUED <br /> (H+S CEDE 25234 (E) (F)) <br /> CCFRREMTS: <br /> EH23—OG6 3/92 (REVISED I1\92) <br /> 3 <br />