Laserfiche WebLink
ivr_v <br /> ry USiSTALLATIO <br /> FACILiT, N IN N REC <br /> . NAME: SPECTIO <br /> TKa <br /> -` D <br /> EPS ADDRESS. <br /> CAPACITY: ULO <br /> PRODUCT. TANK MLDEL/MATERIAL: <br /> A I R.E.H.S: <br /> P N <br /> P I ALL TANKS TO <br /> R T WITH INSTALLED ID AND TESTED CLOtDAMCE <br /> O I MANUFACTlA18TR WRITTEN SPECIFICATIONS <br /> V A <br /> E L <br /> D S <br /> DATE <br /> ITEM OR EO)IPMENT INSPECTED <br /> 1- UST plAliS SUBMITTED/ FEES PAID <br /> 2. I1ST INSTALLATION PLANS APPROVED (H+S CODE 25287, CCR 2635 (D) (8) <br /> INITIAL. INSPECTIONS (CCR 2635 (E) (5)) <br /> VACUUM: <br /> IaN <br /> 7 3- ITEST OF SECONDARY CONTAINMENT: HOLIOAT: <br /> Al1: <br /> AMD SOAP: <br /> T] PSI' XRS/MIM: <br /> / JF 4. PRIMARY TANK TEST: BRINECLIOUID ANNULAR): <br /> OTHER: <br /> PSI. ( XRS/MIN: <br /> Z 5. TANK APPROPRIATELY PLACED WITH APPR <br /> OVER BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br /> PIPING INSPECTIONS <br /> 6. PRIMART PIPING TEST (MINI" 40 PSI/30 <br /> MIN) <br /> I 7. SECONDARY PIPING CONTAINMENT (CCR 2635 (8) (4)) <br /> TEST PSI: HRS/MIW: <br /> i OTHER: (CCR 2635 (A) (4)) <br /> 8. LAKE TEST ON ALL <br /> SOPS (24 HR. MINIMUM) <br /> HRS: (CCR 2635 (A)) <br /> 5' 9. UNUSED TANK OPEIIINCS SEALED AND CORROSION PROTECTED <br /> 10. OVERSPILL PERF <br /> 11. ALL PIPING AND (CCR 2635 (A) (4)) <br /> CORROSION PROTECTED <br /> (COR 2635 (8)) <br /> FINAL INSPECTION <br /> 12. PERFORMANCE TEST FOR 'ALL- MONITORING PROBES <br /> 13. PERFORMANCE TEST OF CONTINUUMS MONITORING SYSTEM (PANEL) (CCR 2632 (C) (2)) <br /> 14. PERFORMANCE TEST OF LINELEAK DETECTI01 (CCR 2632 CA) (2)) <br /> 5 15. PERFORMANCE TEST OF AUTOPATIC PUMP SYSTEM SHUT-OFF (CCR 2632 (0) 2635 (H) (5)) <br /> 9 16. BALL FLOAT VALVES INSTALLED (� 7A�5 (H) (5)) <br /> Il 17. OVERFILL PROTECTION INSTALLED/AppROVED (CCR 2635 CB) (6l) <br /> 5 18- TANK ACCESS (CCR 2635 (E) (2)) <br /> PORTS BROUGHT TO GRADE (LOCYFD AND WTERTI GHT) <br /> 19. TANK INTEGRITY TEST (PASSING HARD Copy) (CCR 2631 (D) (5)) <br /> 20. MONITORING PLAN, (CCR 2635 (A) (5)) <br /> RESPONSE PLAN AND LOG BOOK ON SITE <br /> 21. •O• FORM COP ( 263Z (E) (1) (27) <br /> LETEp AND SUBMITTED <br />�( 22. MONITORING (CCR 2635 (E)) <br /> METHOD FOR ALL TANKS AND PIPING APPROVED <br /> 23. ALL CONDITIONS MET; F (CCR 2641-2644) <br /> AGILITY PERMIT ISSUED <br /> XlF71EMT5: (H*S CODE 25286 (E) (F)) <br /> 23406 3/92 (REVISED 11\92) <br /> 3 <br />