My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2300 - Underground Storage Tank Program
>
PR0231227
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:24 AM
Creation date
11/6/2018 10:38:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0231227
PE
2361
FACILITY_ID
FA0004033
FACILITY_NAME
BEST CALIFORNIA GAS LTD #172
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\P\PACIFIC\7647\PR0231227\INSTALL 1995 .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> t r <br /> 4°C for transport to a state-=tifiedl Iabvratary for analysis. Each sample will he <br /> recorded oa a kih-of-cmtody form Icor submitW to the Lftratory- <br /> Sail and groundwater samples will be artaly7ed by a stabs-cotihed aabnramry for <br /> the following: <br /> 9 Total petroleum hydracrbms as gasoline (TM-C) using EPA <br /> meffio&5MD/8035 <br /> • Bmzette,toluene,ethykmzme, and total xylenes (6l-EK)using EPA <br /> Methods 5030/8= <br /> • Total lead tt5ing EPA Method 6010 <br /> Task 3. Sample S&kgjkdgind Excavated 5cg1 <br /> Undxrground sb=V tank backfW and any ovemr-avated soil will be stockpiled <br /> onsite. Motu will be made to segregate various materials and varying <br /> conarnttwd= of hydro=bork4mpacted sail,if any. The sbockp&-s will be <br /> sampled and analyzed to comply with the req%trem nis of the appropriate <br /> &aposal fatility. <br /> Task 4. aware-Rmxnt <br /> A report pmsentmg the findmp and observations during the above activities will <br /> be submitted to Tosco Northwest Company,and will include the results of soil <br /> sampling azul analysis. A site plan showing the lamfiens of the f mter tanks <br /> and piping,occavatiotl area,stockpiled soil, and nearby buildings will also be <br /> �frepared and included in the report. <br /> a\VMI%% OFF. \IOft7SM 2 <br /> t0 'd 2066 £29 9H IN Xdd (EINUfII')SSEM Wd £9:60 NW G6-eZ-A& <br />
The URL can be used to link to this page
Your browser does not support the video tag.