My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 REPAIR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010 REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:17:01 PM
Creation date
11/6/2018 12:09:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 REPAIR
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\S\SAN JOAQUIN\345\PR0231867\REPAIR PLAN 2010.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br /> . � w <br /> Shaw Environmental,Inc. <br /> 4005 Port Chicago Highway <br /> `—� Concord,California 94520-1120 <br /> ''. 'Phone:925.288.9898 <br /> ,�,aSlia f ' Shaw Environmental, Inc. Fax:925.288.0888 <br /> RRECEYED <br /> May 26, 2010 Shaw Project No. 137813.03 <br /> JUN- a 2 2U1� <br /> Mr. Jeffrey Wong <br /> San Joaquin County Environmental Health Department ENVIRONMENT HEALTH <br /> , t <br /> 600 East Main Street PERMIT/SERVICES <br /> Stockton;California 95202 <br /> i <br /> Subject: Letter Report for Pipeline Removal Activities <br /> .AT&T Facility#UE042 + <br /> 345 North San Joaquin Street <br /> .Stockton, California <br /> I <br /> LDear Mr. Wong: <br /> G <br /> Shaw Environmental, Inc. (Shaw) is pleased to present this letter report detailing'field <br /> Lek, <br /> .-� activities and laboratory analytical results conducted on behalf of AT&T.at-their above <br /> mentioned facility(Figure 1). Field activities consisted of removal and disposal of ; <br /> approximately 5 feet of diesel fuel piping and approximately 100 feet of vent.line.piping, <br /> L and the collection and analysis of a soil sample from the pipeline trench. <br /> AT&T's construction management contractor, Roebbelen Construction, subcontracted <br /> Gettler-Ryan, Inc. (Gettler-Ryan)to provide and operate equipment to perform the 1 <br /> pipeline removal activities. Stantec Architecture Inc. (Stantec)was subcontracted to <br /> obtain permits for the piping removal. Field activities outlined in this report were <br /> I L performed in May 2010. <br /> Site Description I <br /> The site is occupied by a four-story building used by AT&T'far office space and for <br /> operation of telecommunication switching equipment. At the northeast corner of the �. <br /> property,at the corner of Hunter Street and Lindsay Street, is a 25,000-gallon. <br /> J underground storage tank(UST) used to supply fuel for an emergency backup generator <br /> ` (Figure 2): AT&T had decided to replace approximately 5 feet of fuel piping leading <br /> # from the UST to an emergency backup generator in the basement and approximately 100 <br /> feet of vent piping located underneath the sidewalk along Lindsay Street,therefore the <br /> existing piping was scheduled to be removed. Site photographs are included in ; <br /> Attachment 1. <br /> k L ; <br /> .f <br /> _ 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.