Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD <br /> V I.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC.STAND-ALONE <br /> ❑ 4.NO DISPENSERS ❑99.OTHER(S eci ----- <br /> PANELMANUFACTURER: �- MODEL#:TL-5 —__ <br /> LEAK SENSOR MANUFACTURER: MODEL#(S): <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS a.YES ❑b.NO <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN [g a.YES ❑b.NO <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. P9 a.YES ❑b.NO <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. R a.YES ❑b.NO <br /> Y.UDC CONSTRUCTION IS []l.SINGLE-WALLED 2.DOUBLE-WALLED <br /> IF DOUBLE WALLED: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: L] 1.LTQUID LK2.PRESSURE M 3.VACUUM __-__ <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS a.YES ❑b.NO <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. CCR fi2644,1)_,.---____ <br /> ❑2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. ------------------------ <br /> . ___ _ ___ --- <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> pN Alarm logs 5 V isual Inspection Records ❑Tank integrity testing results <br /> 0 SIR testing results(and supporting documentation records). ❑ Tank gauging results(and supporting documentation records). <br /> ❑ATG Testing results(and supporting documentation records). ❑ Corrosion Protection 60-day logs <br /> [Equipment maintenance and calibration records. <br /> M TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> g THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> Or OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" <br /> ❑ OTHER(Specify): <br /> 5a This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training•vill include,Fut is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> • The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> • Names of contact persons)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicatehow many pages with additional information on specific monitoring procedures are attached to this plan. <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The folio g persons)air re on ibl for performing the monitoring and equipment mai na cc: <br /> NAME TITLE <br /> NAME TITLE <br /> The Designated Operator shallperform a monthly visual inspection of the facility, provi a report to the owner/o rotor, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGN DATE: <br /> APPLICANT NA E(print: APPLICANT TITLE: <br /> , I ro <br /> UPCF UST-D(12/2007)3/4 <br />