Laserfiche WebLink
IONIFIED PROGRAM CONSOLIDATED FOR? <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490 I <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 0-90-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)' <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - - <br /> BUSINESS NAME(Same as FACILITY NAME)Fast Lane Central Valley 3. <br /> BUSINESS SITE ADDRESS 116 E Roth Rd 103CITY Lathrop 104 <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance, and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR_§263272634,2638 26412-____________________________ ------------------- <br /> 490-3a <br /> MONITORING EQUIPMENT IS SERVICED ® L ANNUALLY ❑ 99 OTHER(Specify): 490-31, <br /> M.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4904 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490.5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: [-] a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ®d.UNDER VACUUM____ 0-90-6 <br /> PANEL MANUFACTURER: Veeder Root 490-7 MODEL#: TLS-350 490.8 <br /> LEAK SENSOR MANUFACTURER: Unknown 490'9 1 MODEL#(S): Unknown 490.10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. 490-13 <br /> MODEL#: <br /> ------------------- -- ------------------ <br /> IN-TANK PROBE MANUFACTURER: ---------- -- 490--i4, MODEL 4(S): 490-5 <br /> ---------------------------------- ------KL --- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NGHTLY ❑ c.WEEKLY 0-90-16 <br /> __ _❑_d.MONTHLY ❑ e.OTHER(Specify):_ 490-17 <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER490-'9 <br /> g.p.h. g.p.h. (Specify): a9o-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 49040 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 49x21 <br /> 490-22 <br /> ❑ 5.TANK INTEGRTFY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY E] b.BIENNIALLY E] c.OTHER(Specify): 490-24 <br /> 490-25 <br /> [199.OTHER (Specify): 49026 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> ® 1,CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 4913-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:❑a.DRY ❑b.LIQUID FILLED [1c.PRESSURIZED ❑d.UNDER VACUUM--------- 490-29 <br /> PANEL MANUFACTURER:Veeder Root490.30_I MODEL#: TLS-350 490-31 <br /> LEAKSENSOR MANUFACTURER: Unknown °9°0-2 ji-MODEL#(S): Unknown _ 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES EI b.NO 490-34 <br /> FAILURE/DISCONINECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR§2636 490-36 <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490-35 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) _ 490-39 <br /> ----------------------------------------- -- --- <br /> ELLD MANUFACTURER(S) __-__-_--___------.--- 0-9040. MODEL#(S)-_- 49041 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINHAUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 49043 <br /> ELLD FAB.URE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑&YES ❑b.NO 490-44 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FRE UENCY ❑ &ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. 490.0-8 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TPAE SYSTEM OPERATED' 490-0-9 <br /> •Allowed for monita' of.bufi demer en everetm fuel pipi,..Iy W HSC§25281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(8)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490.51 <br /> 490.52 <br /> ❑ 99.OTHER(Specify) 49a53 <br /> UPCF UST-D(12/2007)1/4 <br />