Laserfiche WebLink
NIFIED PROGRAM CONSOLIDATED FOR <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> x90 s4a <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 49044b <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> __❑____4_NO DISPENSERS 099.OTHER(Spec_f_y)------—.—______--____.____---__ ____. _ _—__-----__--- _ _ <br /> ago-ss MODEL#:TLS-350 <br /> PANEL MANUFACTURER:Veeder Root 490-56. <br /> LEAK SENSOR MANUFACTURER:Unknown 490'50 MODEL N(S):Unknown 490-sa <br /> DETEC=� M <br /> INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a.YES ❑b,NO 490-59 <br /> UDC LEGERS AUTOMATIC PUMP SHUTDOWN ® a.YES ❑b.NO 49x60. <br /> FAILURTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑b.NO 49M1 <br /> UDC MPS THE FLOW OF PRODUCT AT THE DISPENSER ® a.YES ❑b.NO 490.62 <br /> 2.UDC CON ❑L SINGLE-WALLED ®2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: bso`-sae <br /> UDC_INTERSTITIAL SPACE IS MONITORED BY__ Q L LIQUID ❑2.PRESSURE ®3,VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ®a.YES [Ib.NO 490.646 <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS M2 IRED.�23 CCR§2644_IZ___ <br /> ❑2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. --49°66 <br /> ®3.SPILL BUCKETS ARE TESTED ANNUALLY, a9os7 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> ®Alarm logs 490-68a ®Visual Inspection Records 490.686 ❑Tank integrity testing results 490-680 <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 49a68a <br /> ❑ATG Testing results(and supporting documentation records).490-68f ❑ Corrosion Protection 60-day logs 490.688 <br /> ®Equipment maintenance and calibration records. 39M8h <br /> IX.TRAINING <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 490.69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490s9b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-694 <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"49x698 <br /> ❑ OTHER(Specify):M6914 M69i <br /> ®This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.49x70 <br /> =indicate <br /> TS/ADDITIONAL INFORMATION <br /> rthis <br /> de additionaadditional information on specific monitoring procedures are attached to this plan.49x71 <br /> SONNEL RESPONSIBILITIES <br /> UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> lan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Agnes Malbot 490-72 TITLE Manager <br /> 490-73 <br /> NAME Hardeep Gill 490-74 TITLE Project Manager <br /> 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> )CIL OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: 490-777 <br /> 14 <br /> 490x9 <br /> APPLICANT NAME(print): 49°.78 APPLICANT TITLE: <br /> Hardeep Gill Project Manager <br /> UPCF UST-D(12/2007)3/4 <br />