Laserfiche WebLink
FtCEIVED <br /> NOV 0 2 2016 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 326.01 ENVIRONMENTAL HEALTH <br /> Cam lets the following checklist: DEPARTMENT <br /> ir—Q YesqNc* <br /> the audible alarm operational? <br /> M Yesthe visual alarm operational? <br /> ❑ Yesere all sensors visually inspected,functionally tested,and confirmed operational? <br /> ❑ Yes ere all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with theiro era operation? <br /> P Yes No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> ❑ N/A <br /> ❑ Yes - No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br /> NIA detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shutdown? (Check all that apply) <br /> ❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> faiiureldisconnection? ❑Yes; -] No. <br /> Z Yes No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no mechanical overfill prevention <br /> NIA valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent <br /> of tank capacity does the alarm trigger? 90 % <br /> Yes* Q No Was any monitoring equipment replaced? If yes, identify specific sensors, probes,aall <br /> ment replaced and list the <br /> manufacturer name and model for all replacement arts in Section E,below. <br /> ri Yes* ❑ No Was liquid found inside any secondary containment systems designed as dry systems? ( ply) Product; Water. If <br /> yes,describe causes in Section E,below. <br /> ❑ Yes J No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,i <br /> ❑ Yes L No` Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Sensors tested: <br /> L2 S. Diesel Tank 1 STP Brine 304 <br /> L6 S. Diesel Tank 1 Fill Brine 304 .J' <br /> L4 N. Diesel Tank 2 STP Brine 304 <br /> L7 N. Diesel Tank 2 Fill Brine 304 <br /> Checked plug and drained Brine from bottom of the sumps above to verify communications <br /> within the sumps Secondary Containment Brine. Got brine sensors alarm <br /> Removed Tank 1 & 2 ATG probes to verify/operate the overfill and high product alarms <br /> Monitor, and outside alarm showed correct alarms. <br /> Monitoring System Certification Page 2 of 4 12107 <br /> 2 2/21/07 <br />