My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO 2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:34:16 PM
Creation date
11/6/2018 12:48:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\116\PR0523684\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
4/24/2018 11:35:23 PM
QuestysRecordID
3866361
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*RECEIVED <br /> NOV 0 2 2016 <br /> ENVIRONMENTAL HEALTH <br /> F. In-Tank Gauging 1 SIR Equipment: n Check this box if tank gauging is use I Q�f��j I. <br /> Check this box if no tank gauging or SI" i ib�ti feit. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist; <br /> ❑ Yes ❑ No` Has all inputwiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> D Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> 0 Yes L No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> NIA that apply) Simulated leak rate: 0 3 g.p.h.; ❑ 0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ Yes Q No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 0 Yes ❑ No* Was the testing apparatus properly calibrated? <br /> 0 Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No` For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 NIA <br /> ❑ Yes ❑ No` For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> 0 NIA disconnected? <br /> Yes 0 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> II NIA fails a test? <br /> ❑ Yes ❑ No` For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 0 N/A <br /> 0 Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: Tank 1 Diesel South LLD was tested. Passd after an adjustment. <br /> The first testing of this LLD on 6/17/2016 failed because of excessive Line bleed back. <br /> I re laced the turbine syphon jet to allow dispenser pumping to clear trapped air pockets, <br /> 1500 ml of bleedback was noted at the test failure. Retested LLD on 8/8/2016 and passed <br /> with a minor adjustment of the LLD. 300 ml was noted. <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.