Laserfiche WebLink
F. In-Tank Gauging 1 SIR Equipment: © Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> D Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes D No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> LI Yes ❑ No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> ❑ NIA that apply) Simulated leak rate: ©3 g.p.h,; 110.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ Yes 0 No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 0 Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes 0 No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 NIA <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> P1 NIA disconnected? <br /> I Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> 0 NIA fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 0 NIA <br /> 0 Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: South Diesel LLD failed test. A large bleedback was noted. <br /> Purging the lines some did not help. An STP (FE Petro) may have a bad syphon check valve. <br /> We will have to check that out. Possibly replace the LLD. <br /> NOV 0 2 2011, <br /> t=NI�IRO IMPNITAI HEN TH <br /> DE PAH TM ESI-1 <br /> Monitoring System Certification Page 3 of 5 12107 <br /> 3 21211(}7 <br />