My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO 2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:34:16 PM
Creation date
11/6/2018 12:48:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\116\PR0523684\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
4/24/2018 11:35:23 PM
QuestysRecordID
3866361
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> Fast Lane Lathrop (Truck Side), 116 E Roth Rd, Lathrop, <br /> CA 95330 BVEC <br /> NOV 0 2 2016 <br /> Monitoring System Certification Form: Addendum for Vacuum/Pressure Interstitial Sensors <br /> ENVIRONMENTAL HEALTH <br /> I. Results of Vacuum/Pressure Monitoring Equipment Testing DEPARTI/IENT <br /> This page should be used to document testing and servicing of vacuum and pressure intcrstitial sensors.A copy of this form must be included <br /> with the Monitoring System Certification Form,which must be provided to the tank system owner/operator.The owner/operator must submit a <br /> copy of the Monitoring System Certification Form to the local agency regulating UST systems within 30 days of test date. <br /> Manufacturer: Veeder Root Model: System Type: ❑ Pressure; 0 Vacuum <br /> Sensor <br /> Component(s)Monitored by this Sensor: Diesel South Piping <br /> S1 <br /> Sensor Functionality Test Result: ©Pass; El Fail Interstitia]Communication Test Result: ❑ Pass; El Fail <br /> Component(s)Monitored by this Sensor: Diesel South Vent Line <br /> S2 <br /> Sensor Functionality Test Result: EZ Pass; ❑ Fail Interstitial Communication Test Result: El Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: Diesel North Piping <br /> S3 <br /> Sensor Functionality Test Result: 0 Pass; E] Fail Intersti#ial Communication Test Result: ❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: Diesel North Vent Line <br /> 54 Interstitial Communication Test Result: Pass Fail <br /> Sensor Functionality Test Result:i�Foss; El Fail ❑ � ❑ <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑Pass; ❑ Fail <br /> Component(s) Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑Pass; ❑ Fail Interstitial Communication Test Result:❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑Pass; ❑ Fail Interstitial Communication Test Result: ❑Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑Pass; ❑ Fail <br /> �71Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br /> How was interstitial communication verified? <br /> ❑ Leak Introduced at Far End of Interstitial Space;' ❑ Gauge; ❑ Visual Inspection; <br /> ❑ Other(Describe in Sec. J,beloiv <br /> \\'as vacuum/pressure restored to operating levels in all interstitial spaces? <br /> ❑ Yes ❑ No(Lf no, describe in Sec. j below) <br /> J. Comments: Still need to test communications. <br /> Page 4 of S <br /> ' If the sensor successfully detects a simulated vacuurn/pressure leak introduced in the interstitial space at the furthest point from the <br /> sensor,vacuum/pressure has been demonstrated to be communicating throughout the interstice. <br /> www.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.