Laserfiche WebLink
F. In-Tank Gauging 1 SIR Equipment: Pi Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com tete the followin checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including tes#ing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No' Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ Nn* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section FI,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): U Check this box if LLDs are not installed. <br /> Com lets the followin checklist: <br /> 0 Yes ❑ No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? (Check all <br /> ❑ NIA that apply) Simulated leak rate: Q 3 g,p.h.; L 0.1 g.p.h ❑0,2 g.p.h. <br /> 0 Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 0 Yes ❑❑ No- Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLE]restrict product flow if it detects a leak? <br /> NIA <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 NIA <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> 0 N/A disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> 0 NIA fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Q NIA <br /> 0 Yes Li NoWere all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section'H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: L22 18a brine sensor needs to be replaced. <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 2121107 <br />