Laserfiche WebLink
D. Results of TestinglServicing <br /> AUG 14 2011 <br /> Software Version Installed: 326.01 <br /> Complete the followinq checklist: <br /> 0 Yes ❑ No, Is the audible alarm operational? <br /> 0 Yes ❑ No" Is the visual alarm operational? <br /> 0 Yes ❑ No` Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> 0 Yes E No` Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> D Yes ❑ No` If alarms are relayed to a remote monitoring station,is all communications equipment(e.g,modem)operational? <br /> 0 N/A <br /> 0 Yes ❑ No" For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br /> ❑ NIA detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) <br /> ��,,p SumplTrench Sensors; 0 Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? v Yes; ❑ No. <br /> 0 Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no mechanical overfill prevention <br /> ❑ NIA valve is installed),is the overfill warring alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent <br /> of tank capacity does the alarm trigger? 90 % <br /> ❑ Yes` ? No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> 0 Yes` ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)❑ Product; k Water. If <br /> es,describe causes in Section E,below. <br /> p Yes ❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> 0 Yes ❑ No" I Is all monitoring equipment operational per manufacturei's specifications? <br /> "In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Remove liquid from 3 sumps. <br /> Monitoring System Certification Page 2 of 4 12/07 <br /> 2 2121107 <br />