Laserfiche WebLink
CL Properties, VI E37801.01A <br /> December 6, 1999 Page B-3 <br /> B-3 Direction from the Site to the Hospital: From the site travel south on South Center Street <br /> approximately one block to East Sonora Street. Tum left on East Sonora Street and travel east <br /> approximately one block to Elk Dorado Avenue. Tum left onto El Dorado Avenue and travel north <br /> approximately one mile to West Acacia Street. Tum left on West Acacia Street and travel west <br /> approximately %Z mile to the Dmeron Hospital on the left-hand side of the street just after the North <br /> Lincoln Street intersection. <br /> B-4 Air Monitoring Program and Respiratory Protection: If any unusual strong odors are <br /> noted, work will be temporarily discontinued and the source of the odor evaluated. In the event <br /> concentrations of hydrocarbon vapors measured in the breathing zone exceed 10 parts per million <br /> (the threshold limit value for benzene), work will be suspended and the site evacuated until <br /> engineering controls can be implemented to reduce the hazard. Respiratory equipment will available <br /> on-site and but will only be used if high levels of hydrocarbon vapors are detected and it is necessary <br /> to secure equipment prior to evacuating the site. <br /> B-5 Personal Protective Equipment: It is anticipated that the level of personal protection required <br /> for this project will be U.S. EPA Level D or modified Level C. Personal protection will only be <br /> modified to Level C in the event it is necessary for emergency evacuation of the site. Personal <br /> protective equipment for each member of the field team will be available on-site and used as may <br /> be required by field conditions. A summary of the personal protective equipment is as follows: <br /> • Full or half face respirators equipped with organic vapor cartridges; <br /> • Appropriate work clothing and/or Tyvek® coveralls; <br /> • Neoprene rubber gloves; <br /> • Steel-toed leather work boots or steel-toed rubber boots; <br /> • Safety glasses; and <br /> • Hardhats. <br /> Hardhats will be worn at all times. Goggles will be wom during steam cleaning operations. If <br /> required,the remaining personal protective equipment shall be put on before entering the immediate <br /> work area. The sleeves of the coveralls shall be outside of the cuffs of the gloves to facilitate <br /> removal of clothing. If at any time protective clothing(coverall,boots or gloves)becomes tom,wet, <br /> or excessively soiled, they will be replaced immediately. <br /> No eating, drinking or smoking will be allowed in the vicinity of the operations. The project <br /> geologist will designate a separate area on-site for eating and drinking. Smoking will not be allowed <br /> at the facility except in designated areas. No contact lenses will be worn by field personnel. <br /> B-6 Cleanup/Decontamination Procedures: At the end of the workday,the following procedures <br /> will be used to allow for the safe removal and decontamination of personal protective equipment that <br /> may have been required. <br /> • Boots and gloves will be washed with a Alconox® detergent and tap water, then rinsed <br /> before removal. <br />