Laserfiche WebLink
CL Properties, VI E37801.02A <br /> December 6, 1999 Page B-4 <br /> • Boot covers and coveralls will be removed and coveralls placed in a plastic bag for <br /> appropriate disposal. <br /> • Gloves will then be removed and placed in the plastic bag;hands will be washed with soap <br /> and water. <br /> • Spent protective clothing will be stored on-site in 55-gallon drums and properly disposed of <br /> after receipt of laboratory analyses. <br /> B-7 Person Responsible for Health and Safety at Site: Twining's project geologist will be the <br /> designated site safety officer for Twining personnel. His responsibilities will include <br /> implementation of the site safety work plan for Twining personnel involved with the field <br /> operations. <br /> B-8 Site Safetv Meeting: Twining's designated project safety officer will conduct a site safety <br /> meeting prior to commencing work. All Twining personnel involved in the field work shall attend <br /> the site safety meeting and sign the attendance sheet. The following items will be covered during <br /> the meeting: <br /> B-8.1 Site Safety Meeting Agenda <br /> 1. Project: 315 South Center Street and 37 West Sonora Street, Stockton, California, <br /> Twining Project Number E37801.02 <br /> 2. Inclusive dates of field work, from: December 13. 1999 to December 13, 1999 <br /> 3. Personnel responsible for site safety: <br /> a. Division Manager: Walt Plachta <br /> b. Project Geologist: Kerry Elliott <br /> c. Field Geologist/Site Safety Officer: <br /> 4. Safety and Health Hazards on Site: <br /> a. Hazard associated with drill rig and drilling operations. <br /> b. Hazards associated with hazardous materials as summarized in Section B-1. <br /> c.Hazards associated with other site conditions(traffic,heat/cold exposure,overhead <br /> and underground utilities, etc.): Traffic on adjacent streets, and in the parking lot. <br /> Pedestrian Traffic on the sidewalks. Overhead and underground utilities adjacent to <br /> the site. <br /> 5. Personal Protective Equipment to be used: <br /> a. During normal work: as per Section B-5 <br /> b. During special operations (steam cleaning, equipment operation, etc.): as per <br />