Laserfiche WebLink
Morton Paint Company <br /> April 30 , 1987 <br /> conduit will be placed in the trench and backfilled <br /> with sand. The conduit will be hard piped into the CMS <br /> console. The conduit will be attached directly to the <br /> building walls and run to the inside of the building <br /> through existing utility access points . A 1/4 inch <br /> polyethylene transport tube will be Dulled <br /> through the FVC conduit from the vapor probe <br /> location to the CMS console. The trench work and <br /> conduit installation will be conducted by Azonics <br /> Technology under the direction of Groundwater <br /> Technology. <br /> C. Select a specific location and install the CMS <br /> vapor monitoring system console. The factors used <br /> to determine the actual console location will be: <br /> , ( 1 ) access to available electrical 'service ( 2 ) <br /> compatibility with building use; and ( 3 ) accessibility <br /> for servicing. The CMS console will be attached <br /> directly to the concrete building wall with appropriate <br /> fasteners . <br /> D. Direct Azonics Technology' s installation of 1_I0 <br /> Volt/50 Watt service to CMS console locations . The <br /> installation will consist of steel conduit fastened <br /> directly to the concrete walls in accordance with the <br /> uniform electrical code. <br /> Initiate system start up by connecting the electrical <br /> service to the CMS console. Connect the vapor <br /> transport tubing to the CMS console . The CMS unit at F <br /> 4 <br />