Laserfiche WebLink
Jan 23 06 08: 14p M4 Dotten 20533-2650 p. 3 <br /> Facility: Madsen Page 3 <br /> In-Task Gauging I SIR Equipment: <br /> ❑Check this box if tank gauging is used only for inventory control and disregard the following section. <br /> ZCheck this box if no tank gauging or SIR equipment is installed and disregard the following section. <br /> Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑Yes ❑ No* Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑ No* Was accuracy of system product level readings tested? <br /> !❑Yes ❑No* Was accuracy of system water level readings tested? <br /> ❑Yes ❑No* Were all probes reinstalled properly? <br /> ❑Yes ❑No* Were ail items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): <br /> M Check this box if LLDs are not installed and disregard the following section. <br /> ❑Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> M NIA (Check all that apply) Simulated leak rate: ❑ 3 g.p.h.; ❑ OA g.p.h ; [10.2 S.p.h. <br /> ❑Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> M N/A <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ISI NIA <br /> ❑Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> M NIA or disconnected? <br /> ❑Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> M NIA malfunctions or fails a test? <br /> ❑Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> M NIA <br /> M Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: No Deficiencies. <br />