Laserfiche WebLink
MW8 <br /> \ m <br /> l \ <br /> O- <br /> O <br /> \ -o- <br /> Co MW10 <br /> I � <br /> 3000 gallon tanker m <br /> 4000 gallon tanr'�' ' <br /> IFormer <br /> Waste Oil` J�r <br /> Former <br /> 1Ta k r \ ' Station _ MWA <br /> Building MW3 GiC \ \J \ <br /> 1MW7 -O,_:�,ir, <br /> MW5 <br /> \ <br /> 1 Former MW4 <br /> - Tank Field 550 gallon tank' <br /> I MW1 <br /> "009 Way MW9 <br /> O Proposed Soil Borings <br /> Proposed Monitoring Wells <br /> Monitoring wells <br /> 0 30 60 <br /> EA ENGINEERING, <br /> N Scale in feet SCIENCE,AND <br /> TECHNOLOGY,INC <br /> 41 Lafayette Circle <br /> Lafayette, CA. 94549 <br /> Figure 3. Location of proposed monitoring wells and soil Drawn Date <br /> borings relative to existing wells at former Chevron <br /> SS 9-1918, 45 E. Harding Way, Stockton, CA. Reviewed Date <br />