Laserfiche WebLink
I <br /> Tab- <br /> Dual Phase Extraction System-Groundwater Extraction Performance Data <br /> ARCO 4932 <br /> 16 East Harding Way,Stockton,California <br /> Notes <br /> a System start-up and shakedown Groundwater samples collected prior to intitial discharge Water held in knockout <br /> b MtBE reported by EPA method 82608 Asio reported as 390 000 Vg1L by EPA method 624 <br /> c LEL monitoring device and totalizer certification conducted LEL mondonng device not waterproof,replacement ordered Water held in knockout <br /> d Permanent system startup <br /> e System shut down for carbon changeout <br /> f System restarted <br /> g Data not available at time of reporting <br /> h Benzene and MtBE analysis run without prior method blank Analysis run beyond the EPA recommended holding time reported benzene as 1,200 pg/L and MtBE as 29,000 <br /> Vg' <br /> i Groundwater extraction system was shut down to await for samples taken on 08/07/03 to confirm that effluent MtSE hit was in fact a laboratory anamoly The 08/07/03 <br /> samples were received 08/25/03 <br /> GWE system shut down due to air stnpper failure <br /> k Totalizer obtained 09/09/03 <br /> I Totalizer obtained 08/14/03 <br /> m Air stripper additive installed to prevent scaling <br /> E <br /> }l <br /> I <br /> a <br /> F <br /> Tosco Markeirng1594910MARCO 4932 O&M Tables 2004ids Page 2 of 2 <br /> I k <br />