My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002733
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002733
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2020 10:15:18 AM
Creation date
11/6/2018 3:26:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002733
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Tab- <br /> Dual Phase Extraction System-Groundwater Extraction Performance Data <br /> ARCO 4932 <br /> 16 East Harding Way,Stockton,California <br /> Notes <br /> a System start-up and shakedown Groundwater samples collected prior to intitial discharge Water held in knockout <br /> b MtBE reported by EPA method 82608 Asio reported as 390 000 Vg1L by EPA method 624 <br /> c LEL monitoring device and totalizer certification conducted LEL mondonng device not waterproof,replacement ordered Water held in knockout <br /> d Permanent system startup <br /> e System shut down for carbon changeout <br /> f System restarted <br /> g Data not available at time of reporting <br /> h Benzene and MtBE analysis run without prior method blank Analysis run beyond the EPA recommended holding time reported benzene as 1,200 pg/L and MtBE as 29,000 <br /> Vg' <br /> i Groundwater extraction system was shut down to await for samples taken on 08/07/03 to confirm that effluent MtSE hit was in fact a laboratory anamoly The 08/07/03 <br /> samples were received 08/25/03 <br /> GWE system shut down due to air stnpper failure <br /> k Totalizer obtained 09/09/03 <br /> I Totalizer obtained 08/14/03 <br /> m Air stripper additive installed to prevent scaling <br /> E <br /> }l <br /> I <br /> a <br /> F <br /> Tosco Markeirng1594910MARCO 4932 O&M Tables 2004ids Page 2 of 2 <br /> I k <br />
The URL can be used to link to this page
Your browser does not support the video tag.