My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002733
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002733
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2020 10:15:18 AM
Creation date
11/6/2018 3:26:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002733
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table A-4 <br /> Dual Phase Extraction System-Groundwater Treatment Effluent Data <br /> ARCO 4932 <br /> -- - ---- - - - 16 East Harding Way, Stockton, California - --- - - - - - - --- -- ---- <br /> Effluent Concentrations <br /> Average <br /> Totalizer Volume Discharge TPH as Ethyl- Total In <br /> Sample Date Value Discharged Rate Gasoline Benzene Toluene Benzene Xylenes MtBE Compliance <br /> ID- Sampled (gallons) (gallons) /L IL /L !L /L (pg/L) pH (Yes/No) <br /> GW EFFL 05/14/03 a 510 0 0 <5,000 <0 50 <0 50 <0 50 <0 50 <0 50 948 Yes <br /> -- 05/29/03 b 630 0 0 -- - -- -- - -- -- <br /> GW-EFF 07/08/03 c 1,000 0 0 <50 <0 50 <0 50 <0 50 <0 50 1 1 849 No <br /> EFF 08/07/03 g,h 47,800 46,800 108 <50 <0 50 <0 50 <0 50 <0 50 <0 50 836 Yes <br /> - 08/14/03 i 64,200 16,400 163 - - -- -- - -- -- <br /> EFF 08/25103 I - -- - - <0 50 <0 50 <0 50 <0 50 <0 50 8 51 Yes <br /> 09/02103 e - -- - - - -- -- - - <br /> 09/05/03 k -- -- -- - _ - _ _ _ - - <br /> EFF 09/09/03 68,200 4,000 093 <50 <0 50 <0 50 <0 50 <0 50 <0 50 880 Yes <br /> -- 10/09/03 118,600 50,400 117 - -- -- -- - - -- - <br /> EFF 10/23/03 140,560 21,960 109 <50 <0 50 <0 50 <0 50 <0 50 <0 50 796 Yes <br /> -- 10/29/03 141,980 1,420 016 - - -- -- -- _ _ <br /> -- 11/05/03 146,440 4,460 044 - - -- -- -- _ _ <br /> GW-EFF 11/13/03 I,m 151,000 4,560 040 <50 <0 50 <0 50 <0 50 <0 50 <0 50 7 56 Yes <br /> EFF 12/03/03 184,200 33,200 1 15 <50 <0 50 <0 50 <0 50 <0 50 <0 50 820 Yes <br /> EFF 01/12/04 n 263,870 79,670 1 38 <50 <0 50 <0 50 <0 50 <0 50 <0 50 8 62 Yes <br /> EFF 02/04/04 328,800 64,930 1 96 <50 <0 50 <0 50 <0 50 <0 50 <0 50 853 Yes <br /> EFF 03/03/04 407,240 78,440 1 95 <50 <0 50 <0 50 <0 50 <0 50 <0 50 842 Yes <br /> EFF 04/05/04 486,070 78,830 166 <50 <0 50 <0 50 <0 50 <0 50 <0 50 870 Yes <br /> - 04/30/04 d 529,020 42,950 119 - - -- -- - -- -- - <br /> 05l25l04 d 529,020 0 000 - - - -- - -- - -- <br /> EFF 06!14104 a 540,400 11,380 040 <50 <0 50 <0 50 <0 50 <0 50 <0 50 877 Yes <br /> EFF 07/13/04 638,970 98,570 236 <br /> REPORTING PERIOD rJune 2004(06114104 to 07113104) , <br /> TOT WATER DISCHARGED(gal) 637,970 <br /> PERIOD WATER DISCHARGED(gal) 109,950 <br /> PERIOD AVG DISCHARGE RATE(gpm) 2 36 <br /> TOTAL AVG DISCHARGE'RATE m 1 11 t ,> F x <br /> Definitions Wastewater Discharch Permit limitations <br /> pg/L =Micrograms per liter Flow Rate<5 gpm <br /> gpm =Gallons per minute TPH < 100,000 pgll <br /> TPH =Total petroleum hydrocarbons Total BTEX<4,570 pgll <br /> MtBE =Methyl-tert-butyl ether Benzene<500 pgli <br /> - =not available MtBE<0 5 pgll <br /> 50<pH< 100 <br /> Notes <br /> a System start-up and shake-down Groundwater samples collected prior to mtitial discharge Water held in knockout <br /> b LEL monitoring device and totalizer certification conducted LEL monitoring device not waterproof, replacement ordered Water <br /> held in knockout <br /> c Permanent system startup <br /> d System shut down for carbon changeout <br /> e System restarted <br /> f Data not available at time of reporting <br /> g Analysis for all analytes except TPH as gasoline and pH were run without prior method blank Analysis run beyond the EPA <br /> recommended holding time still reported reported the analytes as non-detect <br /> h Sample was not received by the laboratory within the EPA recommended holding time for pH <br /> i Groundwater extraction system was shut down to await for samples taken on 08/07/03 to confirm that effluent MtBE hit was in <br /> fact a laboratory anamoly The 08/07/03 samples were received 08/25/03 <br /> Sample was taken to confirm 08/07/03 sample analyses which were not run according to standard EPA methods <br /> k GWE system shut down due to air stripper failure <br /> I Air stripper additive installed to prevent scaling <br /> m Autodialer installed <br /> n Sample for pH was collected 01/21/04 because original sample was run beyond the EPA recommended holding time <br /> 1%ARC01493210&WRCO 4932 0&M Tables 2004 xls <br />
The URL can be used to link to this page
Your browser does not support the video tag.