Laserfiche WebLink
Ms Lon Duncan <br /> February 9, 2004 <br /> Page 7 <br /> and groundwater monitoring wells are shown on Figure 2 The specific scope of work is discussed <br /> below <br /> • Site Health and Safety Plan As required by the Occupational Health and <br /> Safety Administration (OSHA) Standard "Hazardous Waste Operations and <br /> Emergency Response" guidelines (29 CFR 1910 120), and by the California <br /> Occupational Health and Safety Administration (Cal-OSHA) "Hazardous Waste <br /> Operations and Emergency Response" guidelines (CCR Title 8, Section 5192), <br /> SECOR will update the current site-specific Health and Safety Plan (HASP) prior <br /> to the commencement of fieldwork The HASP will be reviewed by field staff and , <br /> contractors before beginning field operations, and will be in the possession of <br /> SECOR personnel while conducting work activities at the site <br /> • Permitting Well construction permits for the groundwater monitoring and OS <br /> wells will be obtained from the SJCEHD Encroachment permits will be obtained <br /> for the offsite wells proposed in the city right-of-way from the City of Stockton, fd <br /> Public Works Department (CSPWD) prior to the commencement of drilling <br /> activities <br /> r� <br /> • OS Wells Eight-inch diameter soil borings for the 6 proposed OS wells 10S-1 <br /> through OS-6) will be drilled using hollow stem auger drilling equipment Upon <br /> completion of drilling, a 1 25-inch diameter, Schedule 80 PVC groundwater <br /> 14 <br /> monitoring well equipped with a 3-foot long OS diffuser tip will be installed in <br /> each borehole Each OS well will be completed at a rdepth of 40 feet bgs /'Based <br /> on historical site groundwater monitoring data, depth to-groundwater within the <br /> OS wells is anticipated between approximately 25 and 30 feet bgs Field <br /> procedures for the installation of the OS wells are provided in Attachment 2 ;a <br /> • Soil Selection and Analysis No soil samples will be collected due to the soil <br /> data collected from previously installed wells in the vicinity s <br /> • Soil and Water Disposal Soil cuttings generated during drilling operations will <br /> be temporarily stored on-site and covered with plastic sheeting pending <br /> characterization and disposal Soil cuttings will be removed and transported by a 14 <br /> ConocoPhillips' disposal contractor to an appropriate disposal facility Water <br /> generated during the steam cleaning of drilling equipment during the installation <br /> and development of the wells will be temporarily stored on-site in California State „ <br /> Department of Transportation (DOT)-approved 55-gallon drums also pending <br /> transport by ConocoPhillips' disposal contractor to an appropriate disposals <br /> facility Sod cuttings and rinsatelpurge water drums will be temporarily stored on- n <br /> site for approximately 4 to 8 weeks <br /> • Report Following the completion of well installation activities, SECOR will b' <br /> submit a report documenting the findings of the investigation The report will <br /> include soil boring logs, permits, soil and groundwater analytical results, chain-of- <br /> custody documentation, and conclusions <br /> H <br /> i <br /> I lARCO\49321workplans\Revised IRAP&WP doc <br />