Laserfiche WebLink
rq } <br /> S ESC ® R <br /> Ms Lori Duncan <br /> February 9, 2004 <br /> Page 8 <br /> SCHEDULE <br /> SECOR is prepared to initiate the coordination of fieldwork activities, following approval of the revised <br /> t ' <br /> RAP and work plan for OS well installation by the SJCEHD, and following the receipt of necessary <br /> permits and access agreement A report documenting the findings of the assessment will be <br /> submitted approximately six to eight weeks following the completion of fieldwork activities and upon <br /> receipt of laboratory analytical data It is anticipated that construction and start-up of the OS system <br /> could be completed in approximately 3 months following receipt of an access agreement with Taco <br /> Bell d <br /> If there are any questions, please call us at(916) 861-0400 <br /> Sincerely, ra <br /> SECOR international, Incorpora# ,��! <br /> Clinton Harms ° No.C 068399 <br /> Protect Scientist * ExpL 12131106 - <br /> �t <br /> Oft <br /> O►"yC' Yr <br /> QRustyrelsky, <br /> Senior Engineer <br /> Attachments Table 1 —Well Construction Details <br /> Table 2—Sod Vapor Extraction System Performance Data K� <br /> Table 3—Groundwater Extraction System Performance Data <br /> Table 4— Interim Groundwater Batch Extraction Data 4 <br /> Table 5—Groundwater Elevation and Analytical Data r <br /> Figure 1 —Site Location Map , <br /> Figure 2 —Aerial Site Plan <br /> ,A <br /> cc Mr Paul Supple, BPS <br /> r }, <br /> r <br /> 5 ' <br /> i <br /> R <br /> $ 1 <br /> l%ARCO%49321workp1anslRevised IRAP&WP doc <br /> r <br />