My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002735
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002735
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 9:55:52 AM
Creation date
11/6/2018 3:28:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002735
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rq } <br /> S ESC ® R <br /> Ms Lori Duncan <br /> February 9, 2004 <br /> Page 8 <br /> SCHEDULE <br /> SECOR is prepared to initiate the coordination of fieldwork activities, following approval of the revised <br /> t ' <br /> RAP and work plan for OS well installation by the SJCEHD, and following the receipt of necessary <br /> permits and access agreement A report documenting the findings of the assessment will be <br /> submitted approximately six to eight weeks following the completion of fieldwork activities and upon <br /> receipt of laboratory analytical data It is anticipated that construction and start-up of the OS system <br /> could be completed in approximately 3 months following receipt of an access agreement with Taco <br /> Bell d <br /> If there are any questions, please call us at(916) 861-0400 <br /> Sincerely, ra <br /> SECOR international, Incorpora# ,��! <br /> Clinton Harms ° No.C 068399 <br /> Protect Scientist * ExpL 12131106 - <br /> �t <br /> Oft <br /> O►"yC' Yr <br /> QRustyrelsky, <br /> Senior Engineer <br /> Attachments Table 1 —Well Construction Details <br /> Table 2—Sod Vapor Extraction System Performance Data K� <br /> Table 3—Groundwater Extraction System Performance Data <br /> Table 4— Interim Groundwater Batch Extraction Data 4 <br /> Table 5—Groundwater Elevation and Analytical Data r <br /> Figure 1 —Site Location Map , <br /> Figure 2 —Aerial Site Plan <br /> ,A <br /> cc Mr Paul Supple, BPS <br /> r }, <br /> r <br /> 5 ' <br /> i <br /> R <br /> $ 1 <br /> l%ARCO%49321workp1anslRevised IRAP&WP doc <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.