Laserfiche WebLink
Atlantic Richfield Company(ARCO) 2 <br /> ARCO Station #4932 t6 E HaTding Way Stockton CA January IS 2002 <br /> report and will be request extensions if the deadline cannot be met We apologize for this <br /> miscommunication <br /> 2.Dunng the week of the MPE test, PHS/EHD staff made several visits to the site to <br /> observe the progress of the test and to speak with the SECOR staff fieldostaff <br /> monitoring the test The technician on site informed PHS/EHD that4#e pumping test <br /> would be performed on MW-2 and MW-4 on Friday February 16, 2001 When <br /> PHS/E1*arrived at the site on Friday morning they were informed that the pumping <br /> test on well MW-2 had been performed the afternoon before The pumping test on <br /> MW-4 was performed on Friday as scheduled However, the report failed to discuss <br /> either of these tests The SECOR technician reported to PHS/EHD the neither of the <br /> wells could sustain a pumping rate of even 0.5 gallons per minute. The California <br /> Code of regulations requires responsible parties to compare at least two cleanup <br /> alternatives for their feasibility in mitigating the contamination and for their cost <br /> effectiveness Since two different tests were performed at the site, two different tests <br /> should have been discussed in the report. <br /> The pump testing you observed was not formal aquifer testing It was done dust to give <br /> SECOR a better idea of what flow rates could be produced at the site so SECOR could <br /> better design a formal aquifer test SECOR has included additional feasibility testing <br /> (aquifer testing) in this work plan <br /> �. 3. The Additional Site Assessment Report documenting,fieldwork that took place from <br /> July 9-16, 2001, when two soil borings and five shallow groundwater monitoring wells <br /> were installed. Please note that this report was submitted to PHS/EHD approximately <br /> six weeks late <br /> Upon review of the PHS/EHD approval letter dated January 11, 2001 no deadline for the <br /> submittal of the report was issued As above, SECOR will propose formal deadlines in <br /> future work plans for the site <br /> WORK PLAN FOR ADDITIONAL SITE ASSESSMENT <br /> Site Description And Background <br /> The site is an operating AM/FM mini-mart and ARCO service station located at the <br /> intersection of Center Street and Harding Way in Stockton, California The site is located <br /> in a infixed residential and commercial area of Stockton Facilities at the site currently <br /> include one 20,000-gallon gasoline underground storage tank(UST), and one 22,000 <br /> gasoline UST, and associated product lines and dispensers <br /> Recent facility upgrades included excavation and removal of three existing gasoline <br /> USTs, and associated dispensers and product lines Between May 25 and June 9, 1999, <br /> Gettler Ryan Construction of Dublin, California removed three 10,000-gallon double- <br /> walled fiberglass USTs and enlarged the excavation to accommodate the larger new <br /> USTs Approximately 631 tons of soil was over-excavated from the UST complex <br /> WKPLAN4932—1-11-02 doc <br />