My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002747
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002747
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 9:17:06 AM
Creation date
11/6/2018 3:36:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002747
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> ♦ Medical cases requiring ambulance services would be such cases as severe head injuries, amputations, heart attacks, etc <br /> ♦ Should ambulance service be necessary, the following procedures should be taken immediately <br /> • Contact necessary ambulance service and company emergency services by dialing 911 and notify the SHSO for the site <br /> • Administer first aid until ambulance service arrives <br /> • While the inured employee is being transported, the SHSO should contact the medical facility to be utilized <br /> • One designated representative should accompany the inured employee to the medical facility and remain at the facility until final <br /> diagnosis and other relevant information is obtained <br /> Death of an Individual or Hospitalization of Three or More Employees <br /> The procedure as outlined in "First Aid and Medical Cases", above, should be followed If the inured person dies, then SECOR Human <br /> Resources Department, local officials and coroner must be notified immediately, SECOR Human Resources will notify the local OSHA <br /> office within S hours of the incident or fatality in the event of fatality or hospitalization of three or more employees <br /> Response to Spills or Cut Lines <br /> Prevent problems by documenting the location of underground lines (e g , product, sewer, telephone, fiber optic) before starting site work <br /> If a line or tank is drilled through, or another leak occurs, document the event as soon as possible using the Incident Investigation Report in <br /> Attachment 4 Include dates, times, actions taken, agreements reached, and names of people involved Use additional pieces of paper to <br /> document the event completely The SHSO, PM and client must be notified immediately The PM will notify the regulatory authority or <br /> utility as necessary <br /> In the event of a spill/release, follow this plan <br /> 1 Stay upwind of the spill/release <br /> 2 Wear appropriate PPE <br /> 3 Turn off equipment and other sources of ignition <br /> 4 Turn off pumps and shut valves to stop the flow/leak <br /> 5 Plug the leak or collect drippings, when possible <br /> 6 Use sorbent pads to collect product and impede its flow, if possible <br /> 7 Call Fire Department immediately if fire or emergency develops <br /> SECOR International Incorporated 5 Genenc HASP <br />
The URL can be used to link to this page
Your browser does not support the video tag.