My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002753
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002753
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 9:35:56 AM
Creation date
11/6/2018 3:39:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002753
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Atlantic Richfield Company 5 <br /> ARCO Service Station 4932 16 Fat Harding Way,Stockton A May 10200t <br /> SUMMARY OF FINDINGS <br /> • <br /> 1 On February 12-16, 2001, SECOR performed NTE feasibility testing at the site to <br /> evaluate whether MPE technology is a feasible remedial alternative for mitigating <br /> hydrocarbon-impacted soil The results of the feasibility test are as follows <br /> 1 • The MPE test was conducted at maximum vapor extraction flow rates <br /> ranging between 32 7 to 99 2 scfm (MW-4/SVE-1), and at vacuum pressures <br /> ' ranging between 5 5 to 25 inches of water column (MW-41SVE-1) <br /> Induced vacuum readings were observed in observation wells up to 89 feet <br /> ' away from the extraction well Based on the responding induced vacuums, <br /> the radii of influence for the test ranged between 46 7 feet and 89 2 feet <br /> ' • Field FID readings of total hydrocarbons in the vapor stream extracted from <br /> the test wells consistently exceeded 10,000 ppmv During the test <br /> approximately 544 3 pounds of TPHg, 19 5 pounds of benzene, and 440 <br /> 1 pounds of MtBE were extracted from the soil beneath the site <br /> 1 CONCLUSIONS AND RECOMMENDATIONS <br /> Based on the data collected during the NTE test, MPE technology is capable of <br /> 1 removing high concentrations of hydrocarbons from the soil beneath the site <br /> The estimated daily mass removal rates following the initiation of vapor <br /> extraction range from 18 to 26 pounds of TPHg and up to 62 pounds of MtBE <br /> While the rate hydrocarbon removal is expected to decline over time, the <br /> multiphase extraction would significantly reduce the mass of petroleum <br /> hydrocarbons present in the subsurface <br /> ' Based upon the above data and data from the SECOR's First Quarter 2001 <br /> Quarterly Monitoring Report, SECOR recommends that the additional site <br /> ' assessment previously proposed to further evaluate the extent of the MtBE <br /> plume (SECOR - January 5, 2001)be performed prior to preparation of a <br /> remediation plan for the site <br /> ' This report presents our understanding of existing conditions at the subject site The <br /> conclusions contained herein are based on the analytical results and professional <br /> ' judgment, which are in accordance with current standards of professional practice, no <br /> other warranty is expressed or implied SECOR assumes no responsibility for <br /> exploratory borings or data reported by other consultants or contractors <br /> 1 <br /> 1 <br /> i <br /> ' ARCO 49321MPE test doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.