Laserfiche WebLink
' ARCO Products Company Is 0 3 <br />ARCO Service Station #4932, 16 E Harding Blvd Stockton, CA March 24, 2000 <br />. be constructed of 4 -inch diameter schedule 40 PVC pipe and will be <br />screened from approximately 5 to 40 feet bgs <br />• <br />• SVE Well Installation. One soil vapor extraction well will be <br />installed at the location shown on Figure 2 The well will be installed <br />to a depth of approximately 30 feet bgs using 8 -inch diameter hollow - <br />stem augers The well will be constructed of a 2 -inch diameter <br />schedule 40 PVC pipe and will be screened from approximately 5 to <br />30 feet bgs (dependent on depth to groundwater) <br />• Permitting The applicable permits for groundwater monitoring and <br />soil vapor extraction wells will be obtained from the SJCEHD prior <br />to drilling <br />• Soil Selection and Analysis. Soil samples will be collected at 5 -foot <br />intervals and will be sent under chain -of -custody procedures to a <br />California State -certified laboratory Selected soil samples will be <br />analyzed for total petroleum hydrocarbons calculated as gasoline <br />(TPHg) using modified EPA Method 8015, and benzene, toluene, <br />ethylbenzene, xylenes, MtBE using EPA Method 8020 Additionally, <br />selected soil samples, including the sample collected from the capillary <br />fringe in each boring, will be analyzed for MtBE, DIPE, TAME, EtBE, <br />TBA, 1,2 DCA, and EDB by EPA Method 8260 <br />• Monitoring Well Development and Sampling. After installation, <br />the monitoring wells will be developed by rigorously surging the <br />well over the length of the screen interval and by purging <br />approximately 10 casing volumes of water After well development, <br />groundwater samples will be collected and sent to a California <br />Certified Laboratory (Sequoia Analytical) The groundwater samples <br />will be analyzed for TPHg using modified EPA Method 8015, BTEX <br />and MtBE using EPA Method 8020, and fuel oxygenates MtBE, <br />DIPE, TAME, EtBE, TBA, 1,2 DCA, and EDB by EPA 8260 <br />• Well Surveying. Upon completion of well construction, the wells will <br />be surveyed by a licensed surveyor to a local benchmark relative to <br />mean sea level Groundwater gradient will be interpreted utilizing <br />wellhead elevations and depth -to -water measurements <br />• Well Search. A 112 -mile radius well search will be performed to <br />evaluate potential sensitive receptors in the area of the site The survey <br />will include review of DWR files and discussion with the local water <br />purveyor <br />077 41983 310lWPLAN2 doe <br />