Laserfiche WebLink
ARCO Products Company 0 4 <br />ARCO Service Station 44932 16 E Harding Blvd, Stockton, CA March 24, 2000 <br />i• Report. A report will be prepared after completion of necessary <br />field work The report will include soil boring logs, soil and <br />groundwater analytical results, chain -of -custody documentation, and <br />conclusions <br />Field and laboratory procedures are presented as Attachment C <br />is <br />SCHEDULE <br />SECOR is prepared to initiate field work within 2 weeks following approval of this <br />work plan and issuance of permits by the SJCEHD A report documenting the findings <br />of the soil boring installation is anticipated to be submitted approximately 6 to 9 weeks <br />after the completion of the field work and upon receipt of all analytical data <br />If there are any questions regarding the contents of this work plan, please call us at <br />(916) 364-1880 <br />Sincerely, <br />SECOR International Incorporated <br />uLstiBenk� <br />Associate Enai <br />Greg Baklay, RG 6260 <br />Technical Coordinator <br />,,1��ED GF <br />GREG <br />BAACLAy <br />Na 6260 <br />Attachments Figure 1 - Site Location Map <br />Figure 2 - Site Plan with Proposed Boring Locations <br />Attachment A - SCEMD Letter, dated February 11, 2000 <br />Attachment B - Site Specific Health and Safety Plan <br />Attachment C - Field and Laboratory Procedures <br />cc Mr Paul Supple, ARCO Products Company <br />Mr Marty Hartzell, RWQCB <br />077 41983 310lWPLAN2 doe <br />