My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002760
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002760
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 8:44:23 AM
Creation date
11/6/2018 3:42:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002760
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCO Products Company 0 4 <br />ARCO Service Station 44932 16 E Harding Blvd, Stockton, CA March 24, 2000 <br />i• Report. A report will be prepared after completion of necessary <br />field work The report will include soil boring logs, soil and <br />groundwater analytical results, chain -of -custody documentation, and <br />conclusions <br />Field and laboratory procedures are presented as Attachment C <br />is <br />SCHEDULE <br />SECOR is prepared to initiate field work within 2 weeks following approval of this <br />work plan and issuance of permits by the SJCEHD A report documenting the findings <br />of the soil boring installation is anticipated to be submitted approximately 6 to 9 weeks <br />after the completion of the field work and upon receipt of all analytical data <br />If there are any questions regarding the contents of this work plan, please call us at <br />(916) 364-1880 <br />Sincerely, <br />SECOR International Incorporated <br />uLstiBenk� <br />Associate Enai <br />Greg Baklay, RG 6260 <br />Technical Coordinator <br />,,1��ED GF <br />GREG <br />BAACLAy <br />Na 6260 <br />Attachments Figure 1 - Site Location Map <br />Figure 2 - Site Plan with Proposed Boring Locations <br />Attachment A - SCEMD Letter, dated February 11, 2000 <br />Attachment B - Site Specific Health and Safety Plan <br />Attachment C - Field and Laboratory Procedures <br />cc Mr Paul Supple, ARCO Products Company <br />Mr Marty Hartzell, RWQCB <br />077 41983 310lWPLAN2 doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.