Laserfiche WebLink
y Ai <br /> Atlantic Richfield Company • 2 <br /> ARCO 4932,16 East Harding Way,Stockton,CA December 14,2000 <br /> activities Confirmation soil samples collected after over-excavation indicated that <br /> petroleum hydrocarbons had impacted the soil beneath the site <br /> In August 2000, three groundwater monitoring wells (MW-1, MW-2, and MW-3), one <br /> groundwater monitonng/vapor extraction well (MW-4), and one vapor extraction well <br /> (SVE-1) were completed at the site by West Hazmat Drilling of Rancho Cordova, <br /> California Groundwater monitoring wells MW-1, MW-2, and MW-3 were set at <br /> approximately 40 feet bgs and screened from 10 to 40 feet Groundwater <br /> monitoring/vapor extraction well (MW-4) was set at approximately 40 feet bgs and <br /> screened from 5 to 40 feet Vapor extraction well SVE-1 was set at approximately 30 <br /> feet bgs and screened from 5 to 30 feet Boring logs showing well completion details <br /> are available in SECOR's Site Assessment Report, dated November 6, 2000 <br /> Initial groundwater samples collected from the groundwater monitoring wells in <br /> September 2000 were reported to contain TPHg, benzene, and MtBE at maximum <br /> concentrations of 166,000 ppb, 10,500 ppb, and 708,000 ppb, respectively (all from <br /> MW-4) <br /> Quarterly monitoring and collection of groundwater samples and analytical data from <br /> the monitoring wells at the site is ongoing Based on September 2000 groundwater <br /> elevation data, depth to groundwater at the site ranged from 26 45 feet bgs to 27 60 feet <br /> bgs Groundwater flow is estimated to be towards the northeast at a gradient of 0 005 <br /> PROPOSED SCOPE OF WORK <br /> Task I —Pre-Test Activities <br /> Prior to initiation of field activities, SECOR will obtain any necessary permits for <br /> performance of this DPE pilot test from San Joaquin Valley Air Pollution Control <br /> District SECOR has also prepared a site-specific Health and Safety Plan (HASP) The <br /> HASP is required by the Occupational Health and Safety Administration (OSHA) <br /> "Hazardous Waste Operations and Emergency Response" guidelines (29 CFR <br /> 1910 120), and by California Occupational Health and Safety Administration <br /> (Cal-OSHA) "Hazardous Waste Operations and Emergency Response" guidelines (CCR <br /> Title 8, Section 5192) The Health and Safety Plan will be reviewed by the field staff <br /> and contractors prior to beginning field operations at the site and is included as <br /> Attachment B <br /> Task 2—Interim Remediation/Feasibility Testing <br /> Interim remediation/feasibility testing is planned to last five days and will be conducted <br /> using a trailer-mounted DPE system capable of generating flow rates up to 300 cubic <br /> feet per minute (cfm) and vacuums up to 29 inches of mercury (in/Hg) SECOR can <br /> connect the DPE system to one well at a time, or to multiple wells, and can extract soil <br /> 10 <br /> vapor and liquid simultaneously from the well(s) A thermal oxidizer is used to treat <br /> extracted soil vapors in accordance with permit conditions established by the local air <br /> quality management district The period of extraction from a given well is determined <br /> 077 43030 1501pilottest-dnalphase <br />