Laserfiche WebLink
25 May 2000 <br /> Site Health and Safety Plan - RV Circuits <br /> Page 2 of 8 <br /> 2.0. ON-SITE ORGANIZATION AND COORDINATION <br /> Project Team Leader: Nuel C. Henderson, Jr. (467-1006) <br /> or Tony Mikacich(601-3541) <br /> Site Safety Officer: Nuel C. Henderson, Jr. (467-1006) <br /> or Tony Mikacich (601-3541) <br /> Field Team Officer: Tony Mikacich (601-3541) <br /> Drill Rig/Geoprobe Operator: Tony Cordova (Geoprobe) <br /> Hel er(if necessary) <br /> Local Agency: San Joaquin County Public Health Services - Environmental Health Division <br /> Mr. Doug Wilson (209) 468-3446 will provide field oversight; <br /> California Department of Toxic Substances Control <br /> Ms. Megan Cambridge (916) 255-3727 will provide project oversight. <br /> Contractor: Advanced GeoEnvironmental, Inc. <br /> 4005 N. Wilson Way, Stockton, CA 95205 (209) 467-1006 <br /> 3.0. ON-SITE CONTROL <br /> Nuel C. Henderson, Jr. or Tony Mikacich will be designated to coordinate access control and <br /> security onsite. A safe perimeter will be established at 20 feet around boring points, using plastic <br /> cones and tape. No unauthorized person should be within this exclusion area. Site fencing and <br /> building will provide access control points to the work areas. <br />