My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KELLY
>
214
>
2200 - Hazardous Waste Program
>
PR0517911
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 2:41:56 PM
Creation date
11/6/2018 8:40:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0517911
PE
2227
FACILITY_ID
FA0010183
FACILITY_NAME
SPACERAK
STREET_NUMBER
214
Direction
S
STREET_NAME
KELLY
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906026
CURRENT_STATUS
01
SITE_LOCATION
214 S KELLY ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\K\KELLY\214\PR0517911\COMPLIANCE 2000 - 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lodi Metal Tech . ti <br /> INSTRUCTIONS FOR PAINT LINE PERSONNEL: <br /> HANDLING OF WATER BORNE PAINT SLUDGE <br /> LEADMAN: Bob Guzman <br /> Gabrial Cabal.bage <br /> Jim Tonn <br /> THESE MEN ARE RESPONSIBLE FOR THE FOLLOWING: <br /> 1 . All water for drain to have a Ph of 6-7 . <br /> 2 . Deflock holding tank, to settle paint 24 hours before <br /> emptying. <br /> 3 . All employes working in tank to remove paint sludge, will <br /> wear protective clothing and rubber boots that are assigned. <br /> 4 . All solids being removed from settling tank, will be put <br /> in open type lid in 55 gal . drums . Replace lids (with <br /> rubber seals in place) . <br /> 5 . Wash and replace rubber boots , rain gear etc . to assigned <br /> storage locker . <br /> 6 . Label all drums . <br /> 7 . Remove full waste drums to assigned waste staging area <br /> before start up of next paint day . <br /> 8 . Labels will be removed and barrels clean when used for <br /> plant in production i,se. <br /> Item # 4 is a 6 ' high holding tank with a open top. <br />
The URL can be used to link to this page
Your browser does not support the video tag.