My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1240
>
2200 - Hazardous Waste Program
>
PR0513576
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:39:25 PM
Creation date
11/6/2018 8:40:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513576
PE
2227
FACILITY_ID
FA0001304
FACILITY_NAME
STOCKTON SCAVENGERS ASSOCIATION
STREET_NUMBER
1240
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1240 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\N\NAVY\1240\PR0513576\COMPLIANCE INFORMATION.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jim Walsh <br /> Au ust 23, 1988 <br /> Pae2 <br /> establish two phases for the project . Phase I would be the preliminary <br /> characterization of the contamination . Phase II would be the continuing <br /> characterization using the Phase I results to define the appropriate <br /> analytical parameters. <br /> Phase I will include sampling soil 1 foot below the soil surface at three <br /> locations where visual evidence of contamination has been identified or <br /> where contamination is likely to be found. These locations are (1) near the <br /> pond pump, (2) in the center of the pond bottom, and (3) in the drainage <br /> channel near the pond outlet . Pond sample locations are identified on <br /> Figure 2 in the original plan as Slb and S7b . A copy of this figure is <br /> attached . The drainage channel sample locations have not been numbered; <br /> however, the proposed Phase I sample location is the southernmost location <br /> identified on Drawing No. 1 of the original plan. A copy of this drawing is <br /> al'so attached. One additional soil sampling location will be chosen in the <br /> field to provide data on background levels of metals. <br /> We intend to collect samples the week of August 22, receive analytical <br /> results the week of August 29, and present the Phase II plan incorporating <br /> the Phase I results by the week of September 5. <br /> Please call if you have any questions. <br /> Very truly yours , <br /> EMCON Associates <br /> Mark A. Thomas <br /> P "oJect Engine - <br /> Russell J. Sc arlin, P.E. <br /> Executive Manager <br /> cc: Larry Sweetser - NORCAL Solid Waste Systems, Inc. <br /> Attachments: <br /> Figure 1 - Site Location Map <br /> Figure 2 - Storm-water Collection Pond <br /> and Sampling Location Map <br /> Drawing 1 - Storm-water Drainage Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.