My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995 PIPING AND UDC REPLACEMENT PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_1995 PIPING AND UDC REPLACEMENT PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 2:49:06 PM
Creation date
11/6/2018 10:25:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995 PIPING AND UDC REPLACEMENT PLAN
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\T\TRACY\2375\PR0231897\PIPING AND UDC REPLACEMENT PLAN 1995.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SLOPE CONCRETE .AROUND ALL JIA'A' <br /> CONCRETE AROUND ALL SINGLE WALL STAGE II DOUBLE WALL UNDERGROUND STORAGE TANKS <br /> 6 OLES 1" RISE OVER tY RUN VAPOR RECOVERY LINE PRODUCT PIPING <br /> MANHOLES 1" RISE OVER tY RUN IMPORTANT: <br /> (MARK PIPE TO SEPARATE <br /> SLOPE CONCRETE AROUND ALL TANKS ARE TO BE INSTALLED AND TESTED PER CURRENT , <br /> 6 MANHOLES 1" RISE OVER 1Y RUN FROM PRODUCT LINES) <br /> 37 37 MANUFACTURER'S INSTRUCTIONS. <br /> GENERAL: <br /> 55 42 40 I I II I EXCAVATE FOR, SET AND FILL AROUND ALL UNDERCROUND <br /> 6 TANKS AS SHOWN ON DRAWINGS AND SPECIFICATIONS. <br /> TANKS ARE TO BE BALLASTED WITH GASOLINE OR WATER <br /> p : 6 D D D ,DD- AFTER INSTALLATION AND BACKFILL. <br /> 4 D -- 4 . 4 D 'D D D p D WHERE THIS DRAWING IS IN CONFLICT WITH THE LOCAL <br /> 4 4 4 DD 4 4 pD . .; . D 36 DRAWNCONS,IF LOCAL <br /> ARER GUL TIONWALL SUPERCEDE THIS <br /> aPEA GRAVEL AND BACKFILL: <br /> 2 2 49 49 41 29 USE PEA GRAVEL (ROUNDED PARTICLES) WITH A MINIMUM <br /> 30 DIAMETER OF 1/8" AND MAXIMUM DIAMETER OF 3/4". <br /> 21STONE CRUSHINGS SHOULD BE WASHED AND FREE FLOWING. <br /> 20 ANGULAR PARTICLE SIZE SHOULD BE BETWEEN 1/8" AND 1/7'051 I I I I AND MUST MEET ASTM C-33 PARAGRAPH 9.1 REQUIREMENTS. <br /> 47 18 1 1 NO MORE THAN 3% OF BACKFILL MATERIAL SHALL PASS <br /> THROUGH A NUMBER 8 SIEVE. <br /> 1 51 I 16 <br /> II I ANCHORING: <br /> 47 47 �_ I IF NECESSARY, TANKS ARE TO BE ANCHORED PER <br /> 1 <br /> 20 LJ 1 MANUFACTURER'S SPECIFICATIONS. CONSULT WITH OWNER'S <br /> 1 1 1 1 FIELD REPRESENTATIVE TO DETERMINE IF ANCHORING IS <br /> 1 I TO BE INCLUDED. (STRAPS PROVIDED BY OWNER) <br /> PIPING TRENCH TANK TEST: <br /> TANKS MUST BE TESTED ACCORDING TO CURRENT <br /> PLAN VIEW MANUFACTURER'S PROCEDURES. NOTE THAT PROCEDURE <br /> VARIES BETWEEN MANUFACTURERS. <br /> '"-" -- - IMMEDIATELY BEFORE INSTALLATION, ALL UNDERGROUND <br /> STORAGE TANKS SHALL BE TESTED ABOVE GROUND WITH <br /> ' SLOPE CONCRETE AROUND ALL 36 1 1 5 PSI AIR PRESSURE, <br /> 28 6 MANHOLES 1" RISE OVER tY RUN <br /> CONTRACTOR TO F� W MANUFACTUI S AFTER INSTALLATION AND BACKFILL TO TOP OF TANK AND <br /> INSTALLATION INS TIONS TO INSURE NSTALLATION OF PIPING CONNECTIONS, ALL UNDERGROUND <br /> /r PROPER PLACEN' STORAGE TANKS SHALL AGAIN BE TESTED WITH AIR <br /> 45 , 9 ,. . D - D PRESSURE AT 5 PSI WITHOUT PRODUCT AS BALLAST. <br /> 48 D D =-- AFTER COMPLETION OF ALL YARD PAVEMENT WORK, <br /> INCLUDING TANK PADS AND PUMP ISLANDS, A PETROTITE <br /> . '4 D (OR APPROVED EQUIVALENT) TEST SHALL BE PERFORMED <br /> looAT THE EXPENSE OF THE OWNER ON THE TANK, PRODUCT <br /> AND VENT UNES.(NITROGEN TEST FOR VAPOR RECOVERY PIPING) ^ <br /> 12 4 CONTRACTOR SHALL COMPLETE THE TANK MANUFACTURER'S <br /> CHECKLIST AND SUBMIT THIS LIST TO THE OWNER'S <br /> REPRESENTATIVE. <br /> to PIPING <br /> PIPE: <br /> DEFLECTC LATE DEFLECTOR PLATE I FIBERGLASS PIPE TO BE A.O. SMITH OR AMERON (BRANDS <br /> 0 TANK TTOM ® TANK BOTTOM I � MAY NOT BE MIXED, INSTALL PER MANUFACTURER'S <br /> 45' 6 RECOMMENDATIONS). STEEL PIPE TO BE SCH. 40 GALV. <br /> PIPE JOINT SEAL: <br /> GAS7- FITTINGS AND THREADED METAL LA SOFTSET SHALL BE ECONNECTIONS.D ON ALL TEEL PIPE <br /> -- � ALL PIPE AND PIPING SHALL BE AS NOTED ON DRAWINGS. <br /> F TACE PIPING IN TRENCHES ® a D.C. <br /> LINE OBSERVATION WELL DETAIL <br /> _ TANK VENTS: <br /> STAGE I VAPOR RECOVERY V = 1 '-o" 2/2 ALL TANK VENTS SHALL BE 2". <br /> NOTE: <br /> TANK GAUGE DETAIL J 1 AND FILL PIPE DETAIL D ANNULAR SPACE MONITOR DETAIL E NUMBER AND LOCATION OF LINE 13ACKLL: <br /> 1" = 1'-O" 2/2 OBSERVATION WELLS PER PLOT PLAN. 3ACKFILL OVER PRODUCT AND VENT LINES IN TRENCH SHALL BE <br /> CLEAN COMPACTED PEA GRAVEL. PIPING SHALL BE LAID AND <br /> CONTINUOUSLY SUPPORTED ON Sr OF COMPACTED PEA GRAVEL. <br /> -- NO PIPING SHALL BE SUPPORTED BY BLOCKS, PLANKS <br /> OR OTHER DEBRIS. <br /> .STAGE II VAPOR 31 �!5 DISPENSER OUTLINE SLOPE: <br /> RECOVERY LINE-NO // ALL PIPING MUST SLOPE TO UNDERGROUND TANKS. <br /> CONFIGURATION SHOWN IN THIS DETAIL IS FOR _ " g� SIDE / PIPE TESTING: <br /> A GILBARCO "ADVANTAGE' DISPENSER. 3/4" CONDUITS 38 Fl EACH PIPE SYSTEM, PRODUCT PIPING AND <br /> FOR GILBARCO "MPD-3' DISPENSER REFER FOR DISPENSER - VENT PIPING, SHALL BE PRESSURED TO <br /> TO DRAWING 15R-S2VR-CA 2/2. DRIP BOX SENSOR _ I I :i0 PSI AND MAINTAINED AT THAT PRESSURE FOR 24 <br /> -*NOTE: <br /> /h-/V�\ HOURS BEFORE BACKFILLING AND FOR 24 HOURS <br /> AFTER BACKFILLING. IF NO PERCEPTIBLE CHANGE IN <br /> INSTALL TRAFFIC BEARING PLATE TO PROTECT 31 PRESSURE HAS OCCURED AT THE END OF THE TEST <br /> LATERAL PIPING DURING CONSTRUCTION. 56 PERIOD, THE SYSTEM SHALL BE CONSIDERED INITIALLY <br /> ACCEPTABLE. THIS SAME TEST SHALL BE PERFORMED <br /> ***NOTE: <br /> AFTER BACKFILLING. <br /> PROTECT MAIN RUN PIPING UNTIL SLOPING PIPE62 <br /> REACHES THE MANUFACTURE'S MINIMUM BURY .__ IF DOUBLE WALL PIPE IS USED, THE SECONDARY PIPE IS <br /> DEPTH. 44 4 70 BE PRESSURE TESTED AT 5 PSI FOR 60 MINUTES <br /> 3/4" CONDUIT "A" SIDE 1" CONDUIT 13EFORE BACKFILLING AND 60 MINUTES AFTER BACKFILLING, <br /> FOR SPEAKER FOR DISPENSER - CONCRETE <br /> *GILBARCO ST T 4 17 CONCRETE USED SHALL. MEET BP STANDARD SPECS., <br /> ADVANTAGE PLAN DETAIL ® PUMP BOX LINES ER DRAWING BP-S-1, SECTION 1.01. <br /> DISPENSER L 1" = 1'-0" o t7IS— SUMP UNITS <br /> "B" SIDE "A" SIDE v PAINT GRAY BUILDING WALL FIBERGLASS SUMP UNITS ARE TO BE SEALED PER <br /> MANUFACTURE'S INSTALLATION INSTRUCTIONS. <br /> a2 3' I-- 17 :iTAGE II VAPOR RECOVERY <br /> ` 5° 13 1 2" 18 1 2" 5° 18 REFER TO DWG. 15R-S2VR-G 2 2 FOR COMPLETE DETAILS. <br /> 38 46 � PIPING UNIONS —�— 19 /W / I <br /> DISPENSER ISLAND BY GILBARCO 16a <br /> EXPANSION 57 46 17 .°• ° STRAP LINES ! <br /> TOSCO NORTHWEST COMPANY <br /> JOINT ° - o •. ° 10 _ �a TO BUILDING GRADE <br /> CONCRETE SLAB 29 ..... ....... _ .a ° 17 <br /> 6 30 - 5o n 10 a o ° RETAIL MARKETING <br /> :,.,•,. 38 , e ° • 01 0 DESIGN AND ENGINEERING <br /> SAWCUT 4 1/4., v e <br /> �� ;,� z + _ • EFOR O VIR N SL 0 TANKS <br /> 18 <br /> z 7 6 33 2 14 a 31 1 BOOTB�TMP)TRY6 12" J. 12" r 24" 6 10 CALIFORNIA <br /> 0 6 9 _ 5 N 10 5s 10 FREE STAND' ROFILE PLAN VIEW MOUNTED PROFILE DOUBLE WALL FIBERGLASS <br /> 53 6 °-3 a I 6" TANK AND LINE DETAILS <br /> sz 13° 8' a° I 13" VENT RISER DETAILS <br /> g 16 15 34 PEA GRAVEL ' = 5 3/4"=1'-0" DWG. NO.: 15—CA 2/2 REV.: 2 <br /> 32„ 10„ <br /> I I--III= SCALE: 1 26-91 PLOT SIZE MADE BY: : CF <br /> „ [REVISIONS 26-91 CHECKED DATE DWN CKD <br /> B„ B B„ 16„ 22 III-1I i,I I A SIDE - - <br /> L7- " . <br /> PRODUCT PIPING AT DISPENSER ISLAND ELEVATION DETAIL ® DRIP BOX <br /> 15DWTCA2 <br /> \ r <br />
The URL can be used to link to this page
Your browser does not support the video tag.