My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
2300 - Underground Storage Tank Program
>
PR0231418
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:22:07 PM
Creation date
11/6/2018 10:41:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0231418
PE
2361
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TRACY\3775\PR0231418\INSTALL\1995 INSTALL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. Secondary container other th'.'Yedouble-walled tanks (includes interception Y <br />and detection systems). [Section 2633 Ml <br />A. Backfill in secondary container. [Section 2635 (c) 1-83 <br />B. Pore space of granular material used as backfill for primary container(s) complies with Section 2631 <br />(9). [Engineering data to support capacity requirement]. <br />C. Two or more primary containers within secondary container. (include information on product <br />compatibility) <br />D. Secondary container capable of precluding highest anticipated groundwater. <br />E. Secondary container sloped to a monitoring sump from which leakage or precipitation can be detected <br />and removed. <br />F. Water tight corner which extends at least a foot beyond each boundary of the secondary container <br />excavation, sloped to drain away from excavation. <br />20. Secondary container(s) thickness, density, composition, product compatibility. <br />Sized to contain unauthorized releases from primary containers to allow sufficient time for detection and removal. <br />[Section 2631 (c)] <br />21. Secondary container(s) voLumetric requirements: [Section 2631 (e) (1) <br />and (2)] <br />A. single primary containers = 100%. <br />e. Multiple primary containers = 150% of largest primary container or 10% above aggregate. <br />22. Secondary container(s) open to rainfall. [ Section 2631 (f)] <br />Volumetric requirements = 24 hours of 100 year storm in addition to primary container volumes. <br />23. Secondary container floor. [Section 2631 (i)] <br />A. Constructed on firm base. <br />B. Sloped to collection sump ( 1/8 inch per foot). <br />(1) One or more access casings installed in sump. <br />(a) Size to allow removal of collected liquid. <br />(b) Extended to ground surface. <br />(c) Covered with a locked waterproof cap or <br />within a secured facility. <br />(d) Thickness allows for anticipated stresses. <br />(e) Construction materials are not weakened stored product or will not donate, <br />capture, or mask constituents to be monitored. <br />24. Membrane Liner specifications. [Section 2631; k, 1, and m] <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.