My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
2300 - Underground Storage Tank Program
>
PR0231418
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:22:07 PM
Creation date
11/6/2018 10:41:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0231418
PE
2361
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TRACY\3775\PR0231418\INSTALL\1995 INSTALL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25. PIPING INFORMATION "lo/ \or <br />PIPING INFORMATION <br />TANK# <br />TANK# 2 <br />TANK# 3 <br />TANK# <br />DISTANCE from <br />DISPENSER to TANK <br />5'4 5rj <br />C�-'a 55Tf <br />MANUFACTURER <br />SYSTEM TYPE • <br />/FESS rIRE <br />CONSTRUCTION " <br />.7XJ!/$C.E AL.L Row'Cl i o /PiNG <br />MATERIAL "� <br />J -e <br />LEAK DETECTION SYSTEM <br />a <br />O/.)= <br />10D% METHANOL COMPATIBILITY with <br />FRP <br />CORROSION PROTECTION <br />* System Type; suction, pressure, and gravity <br />*` Construction: single -walled, double -walled, lined -trench, etc. <br />'AT-. Material Type; steel -iron, stainless-steel, fiberglass, etc. <br />26. 'F 1 Piping (cross-sectional diagram, including connections to tank and dispensers). <br />iC Double wall piping or _ Secondary containment (Trench liner, etc.) <br />(1) Product line (leak detector or automatic shut-off on <br />pressurized piping). <br />(2) Vent and vapor recovery lines if not designed to <br />prevent the entrance of standing fluids. (Ball float valve) <br />(3) Manways and other single walled pipe fittings on a <br />double -walled tank, if not designed to prevent the <br />entrance of standing fluid. <br />27. x State water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br />28. �7' Plan review and operating permit fees paid. <br />2g. Monitoring and Response Plans submitted. <br />30. Proof of financial responsibility on file. / , <br />31. What is the approximate depth to ground water: U166VVII%AI• <br />(include source of information - borehole logs, monitoring well data, water <br />studies, etc.) <br />32. <br />33. <br />34. <br />35. <br />36. <br />Total number of tanks on site after installation: _ <br />Any existing tanks to be removed or abandoned? <br />Control Board "Facility Permit (B)" application form. <br />3 <br />YES [A, NO I I If yes, submit State water Resources <br />Responsible party(ies) shall submit a "Letter of Commitment" prior to the <br />installation of new tanks. (Applies to sites with documented soil and/or groundwater contamination) <br />County/City Fire District and Building Department notified. <br />REMARKS <br />-------------------------------------------------------------------------------------------------------- <br />-------------------------------------------------------------------------------------------------------- <br />-------------------------------------------------------------------------------------------------------- <br />............................................................."-'.....--................................ <br />-------------------------------------------------------------------------------------------------------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.