My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2007 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
BILLING 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 2:23:14 PM
Creation date
11/6/2018 11:33:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TURNER\2500\PR0232507\BILLING 2007 - 2015 .PDF
QuestysFileName
BILLING 2007 - 2015
QuestysRecordDate
9/8/2016 6:06:18 PM
QuestysRecordID
3186027
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2) <br /> TYPE OF ACTION ❑JNEW PLAN iff 2.CHANGE OF INFORMATION 4WI <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> L FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) QT120 1 OT 0 A ; <br /> BUSINESS SITE ADDRESS S D� �(.-1 r e 103. CITY p 104. <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE' <br /> Testing,preventive maintenance,and calibration of monitoring equipment(c.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632,2634,2638,2641 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3b <br /> TIL MONITO CAT <br /> LOIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. .SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4904 <br /> IV.TANK MONITORING IS PERFORMED:USING THE FOLLOWING.METHOD(S):. . <br /> I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 4905 <br /> VAULT(S)WITH AUDIBLE AND VISUAL A1,ARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: VT a.DRY ❑ b.LIQUID FILLED ❑ e.PRESSURIZED ❑d.UNDER VACUUM 49 <br /> PANEL MANUFACTURER /' �` <br /> CWT-T-MOD <br /> LEAK SENSOR MANUFACTURER: I E 090.9' I MODEL#(S): 490-10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 49x12. MODEL#: 4W13 <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): --___----� 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 49046 <br /> ❑ d.MONTHLY ❑ OTHER(S ): 4W11 <br /> (Spm ...490-18 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTC)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS °90-21 <br /> 490-22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 49034 <br /> Q ( P fY) 490-25 <br /> ❑ <br /> 99.OTHER (Specify): <�27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490'28 <br /> VISUAL ALARMS. (23CCR§2636) <br /> SECONDARY CONTAINMENT IS:Fla.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 090.39 <br /> ------------------ <br /> PANEL MANUFACTURER: �el °�'�y MODEL# 490-31 <br /> '. <br /> LEAK SENSOR MANUFACTURER!, 1 1 - 49632 -MODEL#(S): L S b 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. 1 ❑a.YES [+d NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES 91<.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR$2636 49036 <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 49x38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g p.h.LEAK TESTS (23 CCR§2636) 4W39 <br /> ELLD MANUFACTURERS °9040 <br /> --_--_----__ _-�___.-- <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 09043 <br /> LD FAI.UREIDISCONNECfION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a YES [Ib.NO °90.°6 <br /> 4.PIPE INTEGRITY TEISTJNG 49045 <br /> TEST FRE UENCY [�'a.ANNUALLY D b.EVERY 3 YEARS c.OTHER S mi 4904649047 <br /> 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ &DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 49049 <br /> *Allowedfoamiwfin fmbunN a wr fuel piping only,r H$ 25281 5(b)(3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA l23 CCR§2636(a)(3)I• 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.715 CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 490-53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.