Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI..UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 40 54z <br /> Oso-ae <br /> ❑ 11 CONTINUOUS ELECTRONIC MONITORING El 2.FLOAT AND CHAIN ASSEMBLY [13.ELECTRONIC STAND-ALONE <br /> V� 4'.NO DISPENSERS [1919.OTHER(SpccifY)___ <br /> PANEL MANUFACTURER: 09055 MODEL#: <br /> LEAK SENSOR MANUFACTURER 49057 MODEL#(S): 45°-50 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ❑b.NO 490-59 <br /> IBC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 490,60' <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 490s1 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ❑ a.YES ❑b.NO 49062 <br /> 2.UDC CONSTRUCTION IS []LSINGLE-WALLED ❑2.DOUBLE-WALLED 49063 <br /> IF DOUBLE WALLED: 496-640 <br /> _UDC INTERSTITIAL SPACE IS MONITORED BY: [11.LIQUID -❑2,P_RES_SURE_Q 3.VACUUM ____ _ <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE.AND VISUAL ALARMS ❑a.YES ❑b.NO 490-64b <br /> VII.PERIODIC SYSTEM TESTING <br /> - 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49°05. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED_(23 CCR§2694.1)__ <br /> [SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. ° <br /> . <br /> Be—SPILL BUCKETS ARE TESTED ANNUALLY. 49067 <br /> VIII.RECORDKEEPING <br /> The <br /> llowing monitoring/maintenance records arc kept for this facility: <br /> Alarm logs 490s8a ❑Visual Inspection Records 4% b ❑Tank integrity testing results 490-68n <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 497-6se <br /> ❑ G Testing results(and supporting documentation records).49ob8f ❑ Corrosion Protection 60-day logs 49o-68g <br /> Equipment maintenance and calibration records. 490-68h <br /> IX.TRAINING <br /> enonnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 00b9a <br /> REFE13ENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ©'THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49U69b <br /> U'QPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)4906% <br /> O CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.69e <br /> [g CALIFORNIA UNDERGROUND STORAGE TANK LAW 49aa% <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49 w <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"49069, <br /> Tty h(Sapaify):M69e,MOi <br /> "Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contactperson(s)foremergencies and monitoring alarms.wan <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional inion union on specific monitoring procedures are attached to this plan.49071 <br /> Cwt i l ( reg✓erg 1,0A u ; li r a la rm sed- c D&0 <br /> .PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The folio ' g person( are msporui br for performing the monitoring and equipment nance. . <br /> NAME 4%72 TITLE 4W73 <br /> NAME e 497-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a reporto the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XIL OWNER/OPERATORSIGNATURE <br /> CERTIFICATION:I certify that the info tion provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE V 490-76 DATE: 490-70 <br /> xili er/ 3. urhm-dRe naive r xm <br /> APPLICANT NAME(print): am. 490-7e APPLICANT TITLE: 69079 <br /> C C VAC✓er �� �E�I ✓10. ,2 ©�12ltr�Ol <br /> UPCF UST-D(12/2007)3/4 <br />