Laserfiche WebLink
tank.xln rev 2/10/96 VICINITY MAP GENERAL CONDITIONS CON'T'ACTS SHEET INDEX <br /> RHL DESIGN GROUP INC. E Bevel PI p 300m COORDINATION <br /> 1137 NORTH MCDOWELL BLVD. , _ W t3eV9rtyr p1 �l E pIn"Oo ENVIRONMENTAL HEALTH DEPARTMENT <br /> PETALUMA, CA 94954-1469 f FiaMHuxlad Ave m 1 COORDINATE THE WORK: DO NOT DELEGATE THE RESPONSIBILITY FOR <br /> g y COORDINATION TO ANY SUBCONTRACTOR, FABRICATOR OR SUPPLER. P1 COVER SHEET AND NOTES <br /> (7D7) 785-7880 1G m o z:, - SAN JOAQUIN COUNTY <br /> y, ry .p W Eaton Ave E Eaton Due _ 2 RESOLVE DIFFERENCES OR DISPUTES CONCERNING COORDINATION, P2 SITE PLAN, TANK REMOVAL, & <br /> CLIENT Pacific Bell, 10 East 12th Street Tracy, CA `ua m o INTERFERENCE, OR EXTENT OF WORK. 304 EAST WEBER AVE, 3RD FLOOR INSTALLATION NOTES <br /> JOB/ 9980.40 3 USE LARGE-SCALE LAYOUT DRAWINGS OF OTHER AFFECTED WORK, TO STOCKTON, CA 95202 P3 TANK SECTION/SLAB PUN <br /> DATE 11/08/01 r ... ,VJHiIIhkInd Ave EHgh4and Ave CHECK COORDINATE, AND INTEGRATE THE WORK TO PREVENT <br /> BeI'y9r'dOI Ara INTERFERENCES. P4 TANK AND PIPING DETAILS <br /> BUOYANCY CALCLILAlpNGFOR FLAT gpuF�gOupTAW 1.58 v` �.0�1 W 12th 5iy 4 COORDINATE WORK PERFORMED BY SBC AND OTHERS ASR CONTACT: DAVE WILSON P5 MISCELLANEOUS DETAILS <br /> T E 12th Si INVOLVES THE EXECUTION OF THIS WORK. PH # 209--468-3420 P6 TANK ORIENTATK)N/FITTING LAYOUT <br /> Tracy E 11th W 1titT S7 ..:n ^_ y = Sr <br /> MODERN NEEDING 10,000 Cal. Double Wall Tank 7.15 w--- w rJ" 5 COORDINATE DELIVERY AND STORAGE OF SBC FURNISHED EQUIPMENT P7 TYPICAL TLS-350 INSTALLATION <br /> ,� E Hamilton LIF AND FUEL FOR TESTING. <br /> TANK TANK MAT DEPTH MISC. �, N :._ �, ?. rpAS PERMIT <br /> ','," _ q at m ,.T °' CUTTING AND PATCHING P8 PROJECT CLOSE OUT CHECK SHEET <br /> OO- SLOB WIDTH- 12.00 WL- 0.67 DRYBF- 100 - -• <br /> OL- 27.50 LENGTH- 31.50 TANK- 4.00 SUBBF- 60 `� E9th 57_ �x-'" 9 FPATCHING INISHES, COLORSURLLYES MpUPPLIPOFl�SUNDISNRBED ADJACENT CITY OF TRACY FIRE DEPARTMENT <br /> i`�v ,m Wg , W9tfT 91 �� SE F"�V a-t.. =� 2 COMPLY WITH LOCAL ORDINANCES AND THE REQUIREMENTS OF CCR TmF <br /> WGT- 105W DEPTH- 0.67 DM- 11.00 LOTH DM- 27.5 <br /> 2 SIZE DM- 1 xX n s) Nvb E T n x FIRE PREVENTION DIVISION <br /> ODMW PAW 3.60 Mworea= 20.38 '� 'Y+-. Sr P v,.r r.xx B. INDUSTRIAL SAFETY ORDERS AND OSHA REGULATIONS. DO NOT <br /> CUT OR ALTER STRUCTURAL MEMBERS I ROUT PRIOR WRITTEN APPROVAL 520 NORTH TRACY BOULEVARD <br /> NDS- 3 <br /> VOLUME PCF TOTAL 18s N OF sBc. TRACY, GA. 95376 <br /> BUOYANCY INCLUDING MANWAYS 1479 62.4 92292 3 PERFORM CUTTING ASSOCIATED STRUCTURAL REINFORCING AND PATCHING IN <br /> TANK DEAD 16550 A MANNER TO PREVENT DAMAGE TO OTHER WORK AND TO PROVIDE PROPER CONTACT: JEFF MASON BATTALION <br /> CONCRETE TANKOHSLAB - above WL 253 150 37989 SURFACES FOR THE INSTALLATION OF MATERIALS EQUIPMENT AND REPAIRS. ' <br /> CONCRETE TANK SLAB - below NL 0 88 0 PERFORM DEMOLITION WORK IN SUCH MANNER IAS TO PREVENT DAMAGE TO PH # 209•-831-4704 <br /> EXISTING FACILITIES TO REMAN OR TO BE SALVAGED, AND TO PREVENT <br /> BE DRY 0 100 0 INJURY TO PUBLIC AND WORKERS ENGAGED ON SITE UNDER THIS OR OTHER <br /> BF SUB ABOVE TNK 740 60 44414 CONTRACTS. DEMOLITION DEBRIS SHALL NOT BE ALLOWED TO ACCUMULATE PERMIT _ <br /> BF DRY BELOW TNK TOP- SIDES 0 100 D GENERAL ELECTRICAL NOTES ON SITE HAZARDOUS WORK SHALL NOT BE LEFT STANDING OR HANGING ---�• <br /> OVERNIGHT OR WEEKENDS. <br /> BF SUB BELOW TOP OF TANK - SIDES 793 80 11588 SAN JOAQUIN COUNTY <br /> BF HD DRY 0 100 0 ENVIRONMENT HEALTH DIVISION 4 WHEREVER CUTTING AND REMOVAL OF PORTIONS OF EXISTING WORK IS <br /> BF HD SUB 568 60 34089 804 E.Weber Ave.,Third Fkaw INDICATED, SUCH WORK SHALL BE SAWN IN A MANNER THAT WILL PRODUCE <br /> HD SUB WEIGHT 55 1 87.8 1 4816 Stockton,CA 95202 1. INSULATED FLANGES & KIT OR SHORT SECTION OF PVC CONDUIT TO NEAT AND STRAIGHT LINES, PARALLEL TO ADJACENT SURFACES OR PLUMB 'S" <br /> BF REDUCTION FOR MANWAYS -4067 <br /> Phone:1209)4se3az0 BE USED ON ALL UNDERGROUND PIPING & CONDUITS' AFTER BUILDING FOR VERTICAL SURFACES. GRIND SMOOTH RESULTING EDGES OF CONCRETE C.Jr <br /> TOTAL DOWN LOAD 145387 D,Approved _ PENETRATION. <br /> SLABS OR WALKS. Owl <br /> NET DOWN LOAD 53069 E)lApproved with changes:See Remarks 2 ALL CONDUITS TO HAVE SEAL-OFFS PER LATEST EDITION OF THE 5 NEATLY REMOVE EXISTING FINISH MATERIALS BACK TO CLEAN STRAIGHT UNE <br /> 7,58 ❑Disapproved:See Remarks ON NEAREST SUPPORT IN ORDER TO FACILITATE INSTALLATION OF NEW • <br /> F.S. WITH UT DMEN 1+rS'Cl k�O ccV'�'nY,V>.S NATIONAL ELECTRIC CODE ALL J-BOXES TO BE EXPLOSION PROOF, MATERIALS PATCHES OR REPAIRS. EXECUTE CUTTING AND DEMOLITION BY <br /> F.S. N1THW7 DFADMEN 7.75 Remarks - KILLARK JGRSS-2 OR CROUSE-HINDS GUA SERIES. METHODS WW6CH WILL PREVENT DAMAGE TO OTHER WORK AND WHICH WILL <br /> REQUIRED FACTOR OF SAFETY MINIMUM 1.25 PROVIDE PROPER SURFACES TO RECEIVE INSTALLATION OF REPAIRS AND NEW <br /> FACTOR OF SAFETY 1.25 1.58 WORK. <br /> MAXIMUM LOAD TO DEADMEN FOR F.S. 8911 38907 3. USE CABLE CONNECTOR FITTINGS (CROUSE-HINDS CGB OR -• <br /> AVERAGE LOAD TO EACH ANCHOR POINT 1485 6485 Uate OL By__ �� EQUIVALENT) AT MONITOR & LEVEL GAUGE CABLE CONNECTIONS TO 6 KEEP AREAWAYS, WALKS, CORRIDORS AND STREETS FREE OF DIRT AND <br /> AVERAGE CABLE LOAD DOUBLED CABLE 743 3242 <br /> Approval th se plans extends onl to that which is J-BOXES & PIPE FITTINGS IN SUMP BOXES. RUBBISH. SCOPE OF WORK SUMMARY <br /> CALCS FOR AREAS RE WATERTABLE shown and described here on but does not authorize 7 REPAIR OR REPLACE IMPROVEMENTS DAMAGED AS A RESULT OF THIS WORK `• <br /> R- 4.04 TANK RADIUS or approve any ommisc!on or deviation of requirements 4. ALL UNDERGROUND CONDUITS AND CONDUITS INSTALLED OUTDOORS TO AT NO ADDITIONAL EXPENSE TO SBC. 1. REMOVE EXISTING 2,000 GALLON UNDERGROUND TANK AND ALL <br /> h- 11.41 WL FROM BOTTOM OF TANK + ABOVE - BELOW of State 0W or Leve' Ordl:•11' -,S. BE PVC COATED RIGID. ALL CONDUITS INSTALLED INSIDE BUILDING MAY <br /> Al- 51.32 GROSS CROSS SECTION of TANK BE EMT (COMPRESSION TYPE FITTINGS ONLY). B PROVIDE WATER DAMS AND OTHER NECESSARY, FOR CONTROLLING WATER EPROCEDURES AS RELATED FUEL OIL PIPING. <br /> R USED <br /> SED FFOOR CONCRETE SAW CUTTING. <br /> 2. INSTALL NEW MODERN WENDING 10,000 GALLON DOUBLE WALL STEEL <br /> A2- 51.32 AREA OF TANK BELOW WATER LINE <br /> 0.00 AREA OF TANK ABOVE WATER LINE UNDERGROUND TANK. <br /> 5. CONTRACTOR TO PROVIDE & INSTALL PULL BOXES AS REQUIRED TO <br /> A3- 0.00 DRY BF SIDES OF TANK FACILITATE WIRE PUWNG. 3. INSTALL NEW WESTERN FIBERGLASS FLEXIBLE FUEL OIL SUPPLY AND <br /> A4- 7.01 WET SF SIDES OF TANK <br /> 8. ALL EQUIPMENT, HARDWARE AND SYSTEM COMPONENTS MUST BE RETURN PIPING TO GENERATOR LOCATION. <br /> NOTE: INSTALLED IN STRICT CONFORMANCE WITH MANUFACTIRER'S 4.UPGRADE VEEDER-ROOT INS T50 TANK MONITORING PANEL <br /> Groundwater level recorded 12 to 14 feet below ground. INSTRUCTIONS AND SPECIFICATIONS. <br /> Calculated for ground water 8 Inches below ground. <br /> rDeadmm with holddown straps are proposed. 7. ALL CONDUCTORS TO THWN W. <br /> MI <br /> ENVIRONMENTAL MANAGEMENT APPROVED UST INSTALLATION CONTRACTORS B. ALL CONDUITS TO BE MINIMUM 3/4' UNLESS NOTED OTHERW SE <br /> 1.WX 2.TAIT ENVIRONMENTAL 3. CDM/PCI 4.TAT ENVIRONMENTAL 5. BALCH PETROLEUM 6.FlLNER CONSTRUCTION, INC. <br /> ATTN.: MIKE KISSICK ATTN.: JIM STRE7FZ ATTN.: CARY PARTON ATTIC: GARP NYGREH ATIN.: BILL BALCH ATTN.: STEVE WELGE <br /> 7303 SOMERSET BLVD. 701 N. PARKCFNTER DR. 2030 WEST SEV04TEENH ST. 3283 LUYUNG DR. RANCHO 930 AMES AVE 3533 SEAPORT BLVD. <br /> PARAMOUNT, CA 90723 SANTA ANA, CA 92705 LONG BEACH, CA 90813-1084 CORDOVA, CA 95742 MILPITAS, CA 95035 W. SACRAMENTO, CA 95691 <br /> (562) 663-1315 (714) 560-8639 (562) 432-7996 (916) SM-1090 (408) 942-8686 (916) 372-1985 <br /> (562) 663-132Dfax (714) 560-8237 fax (562) 495-0895 fax (916) 858-1011 fax (408) 942-0131 (916) 372-0911 fax <br /> ENVIRONMENTAL CONSULTANT- SCOPE OF WORK GENERAL NOTES <br /> THE FOLLOWING SCOPE OF WORK WILL BE PERFORMED BY THE ENVIRONMENTAL CONSULTANT UNDER A 1. CONTRACTOR TO FURNISH All LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR THE 15. ALL ELECTRICAL WORK TO BE DONE IN COMPLIANCE WITH CHAPTER 5, ARTICLES 500-50 AND 514 E ro' \\ <br /> SEPARATE CONTRACT WITH SBC. SATISFACTORY COMPLETION OF ALL WORK CALLED FOR OR REQUIRED BY THE DRAWINGS AND <br /> OF THE NATIONAL ELECTRIC CODE SEAL ALL CONDUITS AS REQUIRED UNDER THE CODE. I i/,'� <" <br /> SPECIFICATIONS. 16. NO GALVANIZED PIPE OR FITTINGS FOR DIESEL SERVICE WILL BE ALLOWED. 1G� c e zuaemeuE <br /> 4. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT APPLICABLE UNIFORM BUILDING 17. All CONDUIT SHALL BE PVC COATED PER P-2, RIGID TYPE WITH THREADED CONNECTORS AND BE rz 1 <br /> 1. ATTEND (1) METHODS OF PROCEDURE MEETING AT THE SITE PRIOR TO CONSTRUCTION. I CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL CODE, CALIFORNIA UNDERGROUND STORAGE TANK T"�+,'+ TVA° :. ,i Ko <br /> WRAPPED FOR CORROSION PROTECTION TO A POINT ABOVE GROUND LEVEL. NO DIE CAST, PVC, OR \ s( rrai r r <br /> REGULATIONS, CAL-OSHA CONSTRUCTION SAFELY ORDERS AND ANY OTHER APPLICABLE STATE, CITY, OR �T�'p DoT <br /> 2. TRIPLE RINSE, TRANSPORT, AND DISPOSE OF FUEL STORAGE TANKS IN QUANTITIES SHOWN ON DRAWINGS. COUNTY ORDINANCES. PLASTIC ELEL'TRIGV. CONDUIT OR FITTINGS SHALL BE USED. USE ONLY STEEL CONDUIT FITTINGS. <br /> 3. COLLECT REQUIRED NUMBER OF SOIL AND/OR GROUND WATER SAMPLES FROM BENEATH TANK, AND REWIRED 3. CONTRACTOR SHALL PROTECT All. EXISTING FACILITIES TO REMAIN UNLESS NOTED OTHERWISE CONTRACTOR 18. NEW TANKS AND PIPING TO BE TESTED IN ACCORDANCE WITH APPLICABLE REGULATIONS AND HAZARDOUS AREA NOTES <br /> SAMPLES EVERY 15' FROM PIPING TRENCHES AND ANALYZE WITH ON-SITE MOBILE LABORATORY FOR SHALL REPAIR OR REPLACE ANY EXISTING FACILITIES WHICH ME DAMAGED BY THE CONTRACTOR'S SPECIFICATIONS. <br /> CONSTITUENTS REWIRED BY THE LOCAL GOVERNING AGENCIES. A HARD COPY OF THE ANALYTICAL RESULTS OPERATIONS TO THE SATISFACTION OF THE SBC ENVIRONMENTAL MANAGEMENT (SBC). <br /> 19. ABOVE GROUND FUEL PIPING SHALL BE SECONDARILY CONTAINED AND MONITORED IF NOT LOCATED IN AN OUTSIDE LOCATION, ANY AREA UP TO 18" ABOVE GRADE <br /> TY-FOUR HOURS OF SAMPLE COLLECTION, 4. THE EXISTENCE OF UNDERGROUND UTILITIES IS UNKNOWN. IT SHALL BE THE CONTRACTORS RESPONSIBILITY IN ROOM WITH APPROVED SECONDARY CONTAINMENT. RE <br /> S SHALL BE SUBMITTED TO THE LOCAL AGENCY WITHIN TWENVISIONS � AUTHORIZATIONS <br /> N TO DETERMINE THE EXACT LOCATIONS AND/OR EXISTENCE OF ALL UNDER-GROUND LrnU IES IN WORK LEVEL WITHIN 5'-0' HORIZONTALLY FROM ANY TIGHT TANK FILL PIPE <br /> $ 4. TRANSPORT AND DISPOSE OF RINSATE. AREA PRIOR TO CONSTRUCTION, CO( ) /NTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT FOR FIELD 20. THE CONTRA,CI'OR IS TO COMPLY WITH ALL DUST CONTROL REQUIREMENTS AS SET FORTH BY THE FACILITY SHALL BE CLASSIFIED AS A ..LASS 1 DIVISION 2 HAZARDOUS AREA. <br /> MARKING OF UTILITY LOCATIONS. SUPERVISOR OR HIS DESIGNATED REPRESENTATIVE WHEN DRILLING, CORING, OR OTHERWISE MAKING HOLES OR THE SPHERICAL. VOLUME WTIviN A 3'-0' RADIUS OF ANY TANK VENT No. REns!ons / aurHOR!unoNs oaTc ev <br /> 0 <br /> S. TRANSPORT AND DISPOSE OF FUEL PIPING IN QUANTITIES SHOWN ON DRAWINGS. 5. CONTRACTOR SHALT. APPLY AND PAY FOR ALL PERMITS REQUIRED FOR THE COMPLETION OF THIS PROJECT. PENETRATIONS INSIDE THE FACILITY BUILDING, INCLUDING SCREW HOLES FOR CONDUIT SUPPORTS, ETC. AS A PIPE SHALL BE CLASSIFIED AS CLASS 1 DIVISION 1 HAZARDOUS <br /> ISSUED FOR BID n/s/m MED <br /> ANMINIMUM EFFORT, THE CONTRACTOR WILL CONTAIN AND COLLECT ALL DUST BY MEANS OF PLASTIC SHEEP <br /> H 6. COMPILE CLOSURE REPORT AS REQUIRED BY ENVIRONMENTAL MANAGER D SEND COPIES TO LOCAL AGENCIES CONTRACTOR TO SUPPLY CERTIFICATE OF INSURANCE, CITY BUSINESS LICENSE, EVIDENCE OF CONTRACTORS ISOLATION OF THE WORK AREA AND VACUUMING THE DUST AS IT OCCURS. AREA, BETWEEN S-0' Aa <br /> ID -0' RADIUS AS CLASS 7 DIVISION 2 <br /> AND SBC LICENSE AND ANY OTHER INFORMATION WHICH THE PERMITTING AGENCY REWIRES FROM CONTRACTORS. HAZARDOUS AREA ISSUED FOR CONSTRUCTION 3/77az MED <br /> 6. GENERAL CONTRACTOR SHALL NOTIFY THE ENGINEER PROMPTLY IF SITE CONDITIONS OR DIMENSIONS ALL ELECTRICAL CONDUITS, FITTINGS, ETC. IN THESE AREAS SHALL <br /> s 7. IF APPLICABLE2P. NO WORK IS TO BE PERFORMED OVER THE SWITCH EQUIPMENT WITHOUT MOP (METHOD OF PROCEDURES). CONFORM TO THE LATEST EDITION OF N.EC. ARTICLE 514. <br /> REPRESENTATIVE DIFFERENCES ARE RESOLVED, ELECTRICAL MIRING AND EQUIPMENT BELOW A HAZARDOUS AREA <br /> 22. SBC ENVIRONMENTAL MANAGEMENT WILL PERFORM 6 MONTH SECONDARY CONTAINMENT TEST. ANY FAILURES ARE SHALL BE RATED FOR CLASS 1 DIVISION 1. PROVIDE SEAL-OFF <br /> 7. CONTRACTOR SHALL COORDINATE WITH THE ENVIRONMENTAL CONSULTANT AND SBC FOR DISPOSAL OF TANK, <br /> o THE RESPONSIBILITY OF THE INSTALLATION CONTRACTOR. FITTINGS ON ALL CONDUITS LMEPING OR LEAVING A HAZARDOUS <br /> B I PIPING AND RELATED EQUIPMENT AND THE TESTING FOR CONTAMINATION. AREA PROPRIETARY SBC INFORMATION <br /> CONTACT INFORMATION: II 8. CONTRACTOR TO PULL TANK AND LOAD ONTO TRUCK IN ACCORDANCE WITH LOCAL REQUIREMENTS. NOT FOR GENERAL USE OR DISCLOSURE OUTSIDE OF SBC <br /> j SYDNEY GM - IT CORPORATION GENERAL NOTES ENVIRONMENTAL MANAGEMENT UNDER EXEMPTIONS SET FORTH IN <br /> 4005 PORT CHICAGO HIGHWAY 19• SBC ENVIRONMENTAL CONSULTANT SHALL BE RESPONSIBLE FOR ALL SOIL/GROUNDWATER SAMPLING AND THE CALIFORNIA PUBLIC RECORDS ACT. THIS INFORMATION MAY <br /> CONCORD, CA 94520 ANALYSIS. ENVIRONMENTAL CONSULTANT SHALL TRANSPORT AND DISPOSE OF TANK, PIPING AND ANY IMPORTANT NOTICE ONLY BE USED BY AUTHORIZED PERSONNEL OF THE LOCAL <br /> CONTAMINATED SOIL AND GROUNDWATER. CONTRACTOR SHALL DISPOSE OF CLEAN 5014 CONCRETE DEBRIS GOVERNMENT AGENCY IN CONNECTION WITH APPLICATION FOR <br /> AND MISCELLANEOUS EQUIPMENT. T Section 4216 / 4217 of the Government PER ITS AND AUTHORIZATIONS FOR BUILDINGS, CONSTRUCTION, <br /> (925) 288-2119 PHONE 110. CONTRACTOR SHALL PROVIDE A DETAILED METHOD OF PROCEDURE (M.O.P.) TO SBC FOR APPROVAL PRIOR THE FOLLOWING REQUIREMENTS ARE TO BE MET: Code requires a Dig Alert Identification AND OR ZONING CHANGES. <br /> o (925) 827-2029 FAX Number be issued before a <br /> (925) 988-5386 PAGER TO START OF CONSTRUCTION. MOP SHALL INCLUDE BUILDING VENTALATION SAFETY PROCEDURES. DRAWINGS PREPARED FOR <br /> 11. CONTRACTOR SHUT SUPPLY SBC WITH A DETAILED WORK SCHEDULE AND UPDATE PROGRESS AND/OR a. TA HOUR NOTIFICATION PRIOR TO TANK INSTALLATION. NOTE : LOCAL IMPLEMENTING Permit to Excavate will m valid <br /> 24 HOUR EMERGENCY HOTLINE - FOR AFTER-HOURS EMERGENCIES ONLY - (800) 537-9540 b. TANK SYSTEMS TO BE INSPECTED BY COPA AGENCIES MAY HAVE ADDITIONAL For your Dig Alert ID Number Call � ENVIRONMENTAL MANAGEMENT <br /> E CHANGES ON A WEEKLY BASIS. AT (3) THREE SEPARATE CONSTRUCTION PHASES: REQUIREMENT'S Under �i- <br /> 12. CONTRACTOR SFWl PROVIDE THREE SETS OF SUBMITTALS ON ALL EQUIPMENT TO THE ENGINEER PRIOR TO ground <br /> SLOPE 1. TANK & PRIMARY PIPING HYDROSTATICALLY OR Service Aa <br /> START OF CONSTRUCTION. „d PACIFIC REGION <br /> 1. TRIPLE RINSING OF TANKS) AND TRANSPORT AND DISPOSE OF RINSAIE PNEUMATICALLY TESTED FOR 30 MINUTES. <br /> m - 2. TRANSPORT AND DISPOSAL FOR TANKS) IN QUANTITIES SHOWN ON DRAWINGS. 13. CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING THREE COMPLETE SETS OF OPERATION, MANIENAPNCE <br /> E 2. INSPECTION OF ALL SECONDARY CONTAINMENT, CALL: 422 FREE CALK: TOLL FREE apalEcr 1m1=: <br /> S 3. TRANSPORT AND DISPOSAL FOR PIPING/ DISPENSERS QUANTITIES SHOWN ON DRAWINGS. AND TEST DATA, WHICH SHALL INCLUDE <br /> -422-4'33 '-800-642-UFO PACIFIC BELL FACILITY <br /> 4. COLLECTION AND ANALYSIS OF SOIL AND/ OR GROUNDWATER SMIPLLS. INCLUDING TERING, IN ACCORDANCE WITH @IN SOUTHERN CALIFORNIA, IN NORTHERN CALIFORNIA <br /> 5. DIRECTION OF OVEREXCAVATION, AS REQUIRED. A) ALL MANUFACTURER'S LITERATURE, SUBMITTAL DATA COPIES, INSTALLATION,ON, MANUFACTURER'S GUIDELINES. Two Working Days Before You Dig <br /> z OPERATION AND MAINTENANCE DATA ON ALL EQUIPMENT AND DEVICES INSTALLED. <br /> n 6. PETROLEUM IMPACTED EXCAVATION DEWATERING AND WATER TRANSPORT AND DISPOSAL, AS REQUIRED. 3. FINAL INSPECTION, INCLUDING ALL PORTIONS OF <br /> yi 7. PETROLEUM IMPACTED SOIL DISPOSAL THIS IS TO INCLUDE TANKS, SENSORS, WELLS, PIPING, PUMPS, DOUBLE 0 EAST 12TH STREET <br /> 4E °- <br /> S. COMPLETE CLOSURE REPORTING AS REQUIRED BY OVERSIGHT AGENCY AND ETA, DISTRIBUTE COPIES TO CONTAINMENT SYSTEM, SUMPS, AND ALL OTHER INSTALLED ACCESSORIES. THE LEAK DEFECTION SYSTEM. <br /> Engineers Note to Contractor. TRACY, CALIFORNIA <br /> i APPROPRIATE PARIES. B) ALL TEST RESULTS INCLUDING SLIT NOT LIMITED TO PRESSURE AND/OR LEAK TESTING. c. TANK SYSTEM INTEGRITY TESTS FORWARDED & APPROVED <br /> g BY CUPA PRIOR TO TANK SYSTEM The existence and location of any underground utilities, pipes, TRACCAi 1 UE058 <br /> C) ALL PERMITS, COPIES OF SIGNED-OFF PERMITS FROM ALL AGENCIES INVOLVED. BEING PLACED IN OPERATION. and/or structures shown on these plans were obtained by a <br /> CONTRACTOR REQUIREMENTS: search of available records. To the best of our knowledge, SHEET TMF- <br /> �� 1. CONTRANTRACTCTOR MUSE NOTIFY ENVIRONMENTAL CONSULTANT AT LEAST 48 HOURS IN ADVANCE TO D) COPY OF CORRESPONDENCE WITH VARIOUS AGENCIES CONCERNING THIS PROJECT. d. STATE WATER RESOURCES FORMS (FORMALLY A, B. AND them are no existing u6iites except as shown on these plans. <br /> ~N <br /> � kr SCHEDULE ACR MUS. E) All DOCUMENTS AND DATA SHALL BE INSTALLED IN A RING BINDER AND EACH C) MUTT BE COMPLETED & SUBMITTED PRIOR TO TANK The contractor shall ascertain the We vertical and horizontal EMERGENCY GENERATOR SUCTION SYSTEM <br /> o' 2. CONTRACTOR MUST PROVIDE A COPY OF THE REMOVAL PERMIT, TANK INSTALL PERMIT (AS APPLICABLE), SECTION APPROPRIATELY IDENTIFIED, OUTSIDE COVER SHAT CLEARLY IDENTIFY OPERATION. location and size of those underground utilities to be used COVER SHEET AND NOTES <br /> ' STATE OF CALIFORNIA FORMS A AND B (FOR EACH TANK) (AS APPLICABLE) TO ENVIRONMENTAL JOB LOCATION AND DATE and shall be responsible for arty damage to any public or <br /> v CONSULTANT AT TIME OF TANK REMOVAL. e. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE private utilities, shown or not shown hereon. <br /> y� 3. CONTRACTOR MUST ADVISE CONSULTANT OF THE MOP OR FORWARD INFORMATION REGARDING ANY F) AS-BUILT DRAWINGS ESTIMATE/ ROUTINE ORDER: DATE D3/O7/O2 scuE AS NOTED <br /> rc ACCESS CONSTRAINTS FOR TRUCKS. CONTRACTOR SHOULD BE ADVISED OF 71ME AND LOCATION CHOSEN FOR SUBMITTED & APPROVED BY WPA 1JE1354E <br /> i MOP MEETING AT LEAST ONE A WEEK PRIOR TO ITS SCHEDULED TIME. 14. STOCKPILE OF DIRT SHALL COVERED COMPLETELY WITH PLASTIC TMP. ANCHOR AND SECURE PRIOR TO TANK OPERATIONS. _ DaAwN 9e SPT CHECKED e: MED <br /> PLASTIC TMP FIRMLY TO PROTECT FROM THE LATENTS. sec AunlaRlunDN: <br /> c L EVIDENCE OF FINANCIAL RESPONSIBILITY SUBMITTED TO I��L,II�7B-y7+�,+�� SHEET: 1 OF: g SHEETS SHEET No. <br /> r--r' 1137 N. M BBLLw�P�uAILCMA. CA 94954 (07) 765-1660� ' SBC DRAVANG f 1 J <br /> CUPA ORM hrc JOHN W. JOHNSON, ARCHITECT JAMES H. RAY, CJML ENGINEER TRAC 1N1 -01 -0111 <br /> J <br />