DEMOLITION PLAN SCALL, 1•=B'-D' UST INSTALL PLAN SCALE, 1/B'=1'-D' TANK INSTALLATION NOTES
<br /> Ot INSTALL 10,000 GALLON MODERN WELDING-ENVIRO 16 DOUBLE WALL STEEL TANK WITH VEEDER-ROOT TLS-350-PLUS ALARM
<br /> r I SYSTEM. TANK TO BE SET 60' MINIMUM BELOW FIN. GRD. CONTRACTOR TO FIELD DETERMINE EXACT BURY DEPTH. BACKFILL
<br /> II WiTH CLEAN WASHED SAND.
<br /> I I
<br /> • P t_ / € I ', +, i (D INSTALL AN 8' REINFORCED CONCRETE TANK SLAB WITH ,4 O 12' BOTH WAYS. SET MANHOLE COVERS 3' ABOVE OUTER EDGE
<br /> OF SLAB. (SEE TANK SECTION)
<br /> � - I
<br /> ANNULAR SPACE MONITOR. (MANHOLE COVER TO BE LOCKABLE do WATERTIGHT. SEE TANK SECTION)
<br /> ,
<br /> ! tis �, A = i 1 ,� /�— 04 4' FILL RISER. (MANHOLE COVER TO BE WATERTIGHT. SEE TANK SECTION).
<br /> 4' VENT RISER. (MANHOLE COVER TO BE WATERTIGHT. SEE TANK SECTION)
<br /> 6
<br /> 4 ELECTRONIC TANK GAUGE PROBE RISER. (MANHOLE CONFIT TO BE LOCKABLE AND WATERTIGHT. SEE TANK SECTION)
<br /> a
<br /> s 1a ` \\\ Oj VIEDER–R00T 790091-001 OVERFILL ALARM & VEEDER-ROOT 790095-001 OVERFILL ALARM ACKNOWLEDGMENT SWITCH
<br /> (MUST BE PLACED IN VIEW OF FILL). EXACT LOCATION TO BE FIELD DETERMINED. ALARM SWILL ACTIVATE AT 90% TANK
<br /> CAPACITY. PROVIDE ELECTRICAL FEED FROM 20 AMP BREAKER IN ELECTRICAL PANEL USING 3/4CONDUIT. SEE DETAIL 5,
<br /> 2 0 �� �,\� t9 A \ SHEET F4.
<br /> • i ( ` \
<br /> © UPGRADE VEEDER-ROOT TiS-350 TANK MONITORING PANEL PER SHEET F7. LOCATE IN ATTENDED AREA PROVIDE ELECTRICAL
<br /> FEED FROM 120 AMP BREAKER IN EXISTING ELECTRICAL PANEL
<br /> 2
<br /> .\
<br /> it I ill QINSTALL1' FLEXIBLE FUEL SUPPLY PIPE ;hD 1 1/2' FLEXIBLE FUEL RETURN PIPE INA 4' DIA. SECONDARY DUCT (WESTERN
<br /> FIBERGLASS). SLOPE PIPE 9 1/4PER FOOT DOWN TO TANK.
<br /> • to RUN (2) J12 AND (i) /12 GND. FROM EXISTING ELECTRICAL PANEL TO VEEDER-ROOT OVERFILL ALARM.
<br /> i
<br /> —VC 16 \�`� " 1t INSTALL 2' DOUBLE WALL VENT LINE. SLOPE 1/4' PER FOOT DOWN TO TANK. (SEE DETAILS).
<br /> ur) Z \ /
<br /> • N / ` \ �' 0 INSTALL NEW VENT RISER. (SEE DETAIL 2, SHEET 174).
<br /> 5 16
<br /> I
<br /> is CONTRACTOR TO COMPLETE ALL EWIPMENT TESTS REQUIRED BY GOVERNMENTAL AGENCIES.
<br /> ALL MANHOLES AND BOXES TO BE INSTALLED STRAIGHT TRUE, IN-LINE, AND 3" ABOVE OUTER EDGE OF SLAB.
<br /> 12lI t5 CONTRACTOR TO APPLY 'SEALTIIE' SEALANT TO ALL JOINTS IN WESTERN FIBERGLASS SECONDARY CONTAINMENT SYSTEM AND AT
<br /> 7 ENDS OF VAULT CONDUIT SLEEVE
<br /> SITE PLAN SCALE: 1 =40'-O•
<br /> - to SENSOR CONDUIT & CONDUCTOR RUN. CONTRACTOR TO RUN ONLY (1) BELDEN BELDFOIL #83710 100K SHIELDED CABLE (16
<br /> 16 10 21 AWG MIN.) WITH 10 CONDUCTORS. CABLE TO COMNN 2 CONDUCTORS FOR EACH SENSOR. ALL SENSORS TO BE INCLUDED
<br /> 1 IN ONE (1) HOME RUN FROM TANK AREA TO ILS-350 MONITOR CONSOLE.
<br /> _ r� —REMOVE EXISTING1 , �. Q PIPING PENETRATION INTO GENERATOR ENCLOSURE PER DETAIL 1 SHEET F4.
<br /> _TWELVTH STRki ,� _�_-_ ! 17
<br /> 2,000 GALLON 6 13 "��
<br /> OP 9 i�H . -- UNDERGROUND 22
<br /> FUEL TANK AND 23 ! �, to CONTRACTOR TO REPLACE ANY A/C PAVING DAMAGED DURING FUELING SYSTEM INSTALLATION WITH NEW 4' PAVING OVER B'
<br /> -tom„-, PIPING 17 ! CRB. SLURRY' SEAL–COAT ALL NEW A/C PAVING.
<br /> ` .
<br /> d to CONTRACTOR TO REPLACE ANY CONCRETE DAMAGED DURING TANK SYSTEM INSTALLATION WITH NEW CONCRETE TO MATCH
<br /> J " ) EXISTING IN SECTION, SLOPE, COLOR & KIND.
<br /> a• . '�.. n_ NeW cEHnwmR /� /
<br /> ^I EXISTING NEW 10,000 GALLON SET (W OTHERS)
<br /> UNDERGROUND ; / Q CONTRACTOR TO LOOSELY WRAP WESTERN, FIBERGLASS 4' DUCT WITH INSULATED 12 GAUGE COPPER WIRE FROM TANK PIPING
<br /> w: FUEL TANK \ ,/ SUMP EXIT POINT TO TRACER TERMINATION BOLT ATTACHMENT PER DETAIL 1 ON SHEET F4. BOTH TRACER WIRES TO BE
<br /> RESIDENCE s t, NEW GENERATOR AND14. ATTACHED TO BOLT CAST IN VAULT WALL ATTACH PLASTIC SIGN INSCRIBED WITH 1' BLACK LETTERS ON A WHITE BACK-GROUND
<br /> EXISTING EQUIPMENT _�� = . 1,_. a 'A, ENCLOSURE O "! ,,c ° l IN VAULT. SIGN TO READ 'FUEL PIPE TRACER'.
<br /> >' ZI BUILDING ! "oL'�Ih . (8{Y OTHERS)
<br /> - s'' ❑ `. a- \ NEW BUILDING � , ^ .t„ 27 RUN (2) #12 (CONTROLS) FROM VEEDER-ROOT TANK MONITORING PANEL TO VEEDER-ROOT OVERFILL ALARM ACKNOWLEDGMENT
<br /> z_I i (BY OTHERS) 11 fl-4 SWITCH.
<br /> J' v ~l NEW GENERATOR © RUN (2) J12 AND (2) #12 GND. FROM ELECTRICAL PANEL TO VEEDER—ROOT TANK MONITORING PANEL
<br /> ,
<br /> ENCLOSURE
<br /> C. �' (st OTHERS) © INSTALL LOCKING RECORDS BOX ON WALL FOR STORAGE OF TLS 350 PRINT-OUTS. SEE DETAIL 4, SHEET F4.
<br /> E ayr� NEW BUILDIN Q
<br /> D OTHERS)
<br /> 8Y OTHERS) GRAI
<br /> PROVIDE 3M 31-GALLON PETROLEUM SPILL KIi NGER STOCK { 5F634 (800-994-2343 EXT. 87375)
<br /> alaTION
<br /> !
<br /> q
<br /> .(Y%�£h",l/�gi9JY,Y'^'SYi.Y.fi4Hi,..Y/MNWN gX'9F%7YH�N, �, ,
<br /> 1
<br /> ADJACENT STRUCTURE •
<br /> r
<br /> NORTH
<br /> s DEMOLITION NOTES UNDERGROUND TANK REMOVAL PROCEDURE PIPING INSTALLATION NOTES REVISIONS / AUTHORIZATIONS
<br /> s '
<br /> 1. Contractor shall call U.S.A. and have utilities field marked Shore the edge of the tank hole, if required. All shoring is If excavation Is left open overnight, Contractor to completely NO REVISIONS / AUIHORI A70NS DATE BY
<br /> OREMOVE EXISTING CONCRETE TANK SLAB AND prior to any excavation. In addition, Contractor shall make to be In place before excavating tank. fence off the tank hole with six (6) foot high temporary chain
<br /> 2,000 GALLON DIESEL FUR TANK IN ACCORDANCE visual and magnetic Inspection of work area for any possible link fencing, no exceptions. A lockable gate shall be provided on all ISSUED FOR BID tt/u/ot MED
<br /> E WITH THE UNDERGROUND TANK REMOVAL underground utilities and conduits. Contractor is responsible for 13• Dig down to the top of the tank. excavations left open more than 2 days, See plans for location. UNDERGROUND FUEL SYSTEM PIPING
<br /> PROCEDURES ON THIS SHEET. restoring any underground utilities damaged during construction. ISSUED FOR CONSTRUCTION 3/7/02 MED
<br /> '' 14. Remove the fill (drop) tube and TLS probe, Disconnect the 20, Upon approval of SBC Facility Engineer and SBC Environmental
<br /> S' O2 REMOVE EXISTING UNDERGROUND SUPPLY AND 2• Notify SBC Facilities Engineer, STAN BRODECKI , Site Contact,, fill, gauge, and product and vent lines. Cop or plug open Manager, Contractor shall Install new tank.
<br /> RETURN LINES AND RELATED EQUIPMENT. C,ESAR CRUZ and U.S.A. forty-eight (48) hours prior to start of ends of the lines which are not to be used further. Remove an INSTALL ALL PIPING PER MANUFACTURER'S MINIMUM R PR RADIUS AND ALL OTHER MANUFACTURER'S
<br /> ,. Y INSTALLATION SPECIFICATIONS. CONTRACTOR SHAT. AR PRESSURE TEST ALL PRIMARY & SECONDARY
<br /> � O REMOVE TANK VENT UNE tank removal or any excavation. remaining liquid from the delivery line using care to avoid 21. Replace or restore any existing site condition damaged or PIPING PRIOR TO BACKFlWNG OR CONNECTING TO TANKS AND GENERATORS. ISOLATE AND CAP ALL
<br /> v spillage. altered during the tank removal and Installation, remove sheet
<br /> EXISTING VENT RISER ATTACHED TO BUILDING. 3. Close air conditioning Inlets subject to fumes prior to work. piling. REQUIRED
<br /> PIPING RUNS & PRESSURIZE TO L P.S.I. (MIN,) FOR 30 MINUTES (MIN.), AR LONGER AS — PROPRIETARY SBC INFORMATION
<br /> REMOVE
<br /> REQUIREE D BY LOCAL AGENCY. SOAP TEST ALL JOINTS AND INSPECT FOR LEAKS. REPAIR ANY LEAKS NOT FOR GENERAL USE OR DISCLOSURE OUTSIDE OF SBC
<br /> 15. Plug all tank openings with one plug to have 1/8 loch vent DISCOVERED AS REQUIRED. SECONDARY PIPING TO BE AIR TESTED AFTER CONNECTON IN CONTAINMENT ENVIRONMENTAL MANAGEMENT UNDER EXEMPTIONS SET FORTH IN
<br /> c 4. Fuel in existing underground tank shall be removed and disposed hold for tem temperature ex ansion. 22.A11 water and soil tests shall have results submitted to the THE. CALIFORNIA PUBLIC RECORDS ACT, THIS F THE
<br /> MAY
<br /> CS PAVE TANK AREA WITH ASPHALT CONCRETE TO of b SBC Contractor. Contractor shall furnish fuel disposal P P environmental management department of SBC within 24 hours SUMP AND IN BUILDING PIPE TRENCH AT 3 P.S.I. (MIN.) TO 5 P.S.I. (MAX.) FOR 30 MNl1fES (MIN.), ONLY BE USED BY AUTHORIZED PERSONNEL OF THE LOCAL
<br /> MATCH ADJACENT PAVING SECTION.
<br /> iF documentation to SBC. 16, The tank shall be made inert by using thirty pounds of dry after the samples are taken. OR LONGER ASREQUIRED BY LOCAL AGENCY. SOAP TEST ?MA CONNECTIONS AND JOINTS AND INSPECT GOVERNMENT AGENCY IN CONNECTION WITH APPLICATION FOR
<br /> FOR TEAKS REPAIR ANY LEAKS DISCOVERED AS REQUIRED. MAINTAIN THE AIR TEST ON THE SECONDARY PER ITS AND AUTHORIZATIONS FOR BUILDINGS, CONSTRUCTION,
<br /> Ice per thousand gallons of tank capacity or as require
<br /> CONTAINMENT PIPING DURING THE BACKFILLING PROCESS AND VERIFY THAT NO PRESSURE DROP ANU OR ZONING CHANGES.0 5. RHL DesiGroup will apply for tank removal t. Contactor by local authorities. OCCURRED IN THE SECONDARY PIPING. INSPECT FOR LEAKS. REPAIR ANY LEAKS DISCOVERED. AR DRAWINGS PREPARED FOR
<br /> Is responsible for picking pi permit, paying feeses,, and arranging BACKFlI i Nr. PIPING RUNS, BOTH PRIMARY AND SECONDARY PIPING SYSTEMS TO BE RETESTED PER
<br /> v
<br /> Inspections. All tank and piping removal is by Contractor. 17, After tank has been Inspected by local health and fire
<br /> ��� Contractor shall cooperate with "Environmental Contractor" for inspectors, excavate and remove tank and piping. Contractor to AFOREMENTIONED PROCEDURES. THE TESTING OF THE PRIMARY AND SECONDARY PIPING MUST BE (WITNESSED BY ENVIRONMENTAL MANAGEMENT AND LOCAL REGULATORY AGENCIES. AFTER SUCCESSFUL `�V ��MEMAL AGEMENT
<br /> soil/water sampling and disposal of tank. load tank and piping on transport provided by others. Disposal
<br /> of tank and piping by EmAro. Contractor. Contractor to remove COMPLETION OF PIPING TEST, CONTRACTOR TO PULL BACK REDUCING BOOT FROM SECONDARY PIPING IN
<br /> 6, Provide fire extinguishers of size and rating specified by and dispose of existing concrete tie-down slab beneath tank If TANK SUMP TO ALLOW UNRESTRICTED DRAINAGE FROM SECONDARY PIPING SYSTEM INTO THE PACIFIC REGION
<br /> CONSTANTLY MONITORED TANK SUMP.
<br /> local fire departments. specified In Scope of Work on sheet P-1. PRaECT 1mE
<br /> 7. There shall be no welding or other sources of ignition in the 18. After the existing tank is removed, soil and/or water samples ALL NEWLY INSTALLED TANKS AND TANKS RETROFITTED WITH NEW SUMPS OR NEW HARDWARE THAT PACIFIC BELL FACILITY
<br /> j• area while the removal operations are In progress. There shall will be taken from the tank hole by the Environmental ENTERS OR EXITS A SUMP ARE TO BE HYDROSTATICALLY TESTED WITH A HEAD OF WATER ONE FOOT
<br /> F be no smoking on the job site. "NO SMOKING" signs shall be Contractor. If the soil/water samples are clean, then soil ABOVE THE HIGHEST POINT OF PENETRATION OR JOIN. ALTERNATIVELY, SUMPS MAY BE VACUUM TESTED 10 EAST 12TH STREET
<br /> S#2 9 posted. shall be disposed of by Contractor. If contamination is PER MANUFACTURES INSTRUCTIONS.
<br /> discovered, Contractor to notify SBC Environtmental Manager TRACY, CALIFORNIA
<br /> ,1L 8. Provide barricades with flashing yellow lights and warning immediately. Contaminated soil is to be stacked separately s
<br /> 38 signs to protect pedestrians and/or motor vehicles from on visqueen and covered with visqueen and anchored firmly to � O' S/04, TRACCAi 1 UE058
<br /> work area and tank hole. prevent It from being blown off. Provide an asphalt, concrete or y Al
<br /> "tt 'y;, SHEET TIRE:
<br /> i sandbag berm around all dirt stack plies to prevent runoff. a5n,9 r EMERGENCY GENERATOR SUCTION SYSTEM
<br /> i_
<br /> 9. Drain, and when appropriate, flush product in the piping Into the Disposal of contaminated soil will be under separate contract.S tank. Disposal of contaminated soil will be by Environmental * 'a31� a/ SITE PLAN, TANK REMOVAL, & INSTALLATION
<br /> w Contractor. Contractor shall load contaminated soil on truck ? \10j /,j'' NOTES
<br /> �s 10.The Rinse Contractor shall remove all remaining flammable liquid provided by Environmental Contractor. \ c u �°
<br /> +,�', � ESTIMATE/ ROUTINE ORDER DATE 03
<br /> from the tank which can be pumped out. It mabe necessary ,. `f��t? /07/02 scaE: A$ NOTED
<br /> use a hand pump to remove the bottom few inches of UE1354E DRAWN BY: SPT CHEal &C MED
<br /> i product and rinsate. All residual liquid or sludge, including SBC AUTHORIZATION:
<br /> LL rinstate will be disposed of by Environmental Contractor. �HTjr ARC®TECI'ORB • RNGQi MG • M1110NIIIiMffAL SIiMCES SHIFT: 2 OF: 8 SHEETS SHEET No.
<br /> 11.Sawcut and remove concrete or A.C. cover for access to ����►l1L 1137 N. MCDOWl BLVD. PETALUMA, CA 94954 (707) 765-1660 ssc DRAWING No.:
<br /> tank, dispose of concrete and A.C. debris. aam Inc JOHN W. JOHNSON, ARCHITECT JAMES H. RAY, aNL ENGINEER — TRAC 1 1 —01 —01111 F�