Laserfiche WebLink
Buoyant forces are partially resisted by the 6.3 When ballasting the tank, ballast level inside the <br /> weight of the tank, the backfill and the pavement tank must never exceed the water level, or <br /> atop the tank. Additional buoyant restraint, when backfill level, in the excavation during <br /> required, shall be obtained by using property installation. <br /> designed hold-down straps in conjunction with <br /> concrete hold-down pads or deadman anchors. <br /> The use of steel cable or round bar as hold- <br /> down straps on the tank is prohibited. <br /> Hold dawn strap. <br /> IMOuW b,a.c.rand <br /> kom m*unk by.n - <br /> m.rt wai,un <br /> r ' <br /> 7.0 FINAL AIR TEST <br /> 7,1 Install required tank piping using compatible non- <br /> 5.2 Installers of hold-down straps shall ensure that hardening sealant, taking care not to cross <br /> the straps are separated from the tank by a pad thread or damage the nylon bushings. Torque of <br /> made of inert insulating di-electric material. The <br /> separating pad shall be wider than the hold- 400 to 1,000 ft-lbs (542.3 to 1355.82 N-m.) shall <br /> down straps,which will prevent direct contact be required to fully insert pipe, <br /> between the straps and the tank shell. <br /> 7.2 Where air or hydrostatic testing is required after <br /> 5.3 Ballasting the tank may be necessary. When installation, the pressure applied shall not be in <br /> water is used as the ballast material, it shall only excess of 5 psi (34.5 kPa)as measured at the <br /> be potable water and shall not remain In the tank top of the tank- A soap solution shall be applied <br /> longer that 60 days, around pipe connections while air test is being <br /> performed. <br /> 6.0 BACKFILLING 8.0 ELECTRICAL ISOLATION <br /> 6.1 Homogeneous backfill material similar to the <br /> bedding material shall be carefully placed around 8.1 All openings shall be isolated where electrical <br /> the entire tank to create a uniform homogeneous accessories will be installed such as submersible <br /> environment. Avoid damage to laminate pump,monitoring equipment and all other <br /> especially where tamping is required. grounded electrical devices. <br /> a <br /> SPECIAL SAWILIL <br /> PLACEMENT REOUIRED <br /> MON T MEW. <br /> �tM <br /> 6.2 Installing and tamping backfill along the bottom 8.2 Prior to backfilling to top of tank, all openifgs <br /> sides of the tank shall ensure that the tank is shall be visually inspected to assure that the di- <br /> fully and evenly supported around the bottom electric isolation (nyton bushings or flange r 3 <br /> quadrant. gaskets),where furnished, remains in place. <br /> Where flanged openings have been used, <br /> Isolation of the flange gaskets shall be confirmed <br /> with a continuity tester. CnntAnt with tha.t..L- <br />